Skip to content. | Skip to navigation

Personal tools

Navigation

Questions or Comments:
siprules@tceq.texas.gov
You are here: Home / Air Quality / SIP / SIP Revision: Houston-Galveston-Brazoria, April 19, 2000

SIP Revision: Houston-Galveston-Brazoria, April 19, 2000

Revision to the State Implementation Plan for Houston-Galveston-Brazoria adopted on April 19, 2000.
On April 19, 2000, the TCEQ adopted a revision to the Texas State Implementation Plan (SIP). These revisions served as the required next step in the attainment demonstration planning process for the Beaumont–Port Arthur (BPA), Dallas-Fort Worth (DFW), and Houston-Galveston-Brazoria (HGB) ozone nonattainment areas. This page provides information on this revision to the SIP.

About the Revision

Adoption Date:

4/19/2000

Proposal Date:

12/16/1999

EPA Approval Date:

N/A

Key Changes: This revision to the SIP includes the enforceable commitments required by the U.S. Environmental Protection Agency–Natural Resources Defense Council settlement to make the Houston-Galveston-Brazoria attainment demonstration complete.

return to topReturn to top


Related Rules

(Help with PDF and WP.)

SIP Narrative and Misc. Documentation

Title Log No. PDF WP
HGB Attainment Demonstration SIP (Adopted) 1999-055-SIP-AI
HGB Attainment Demonstration SIP (Proposed) 1999-055-SIP-AI

Appendix

App. Title PDF WP
Adopted Appendix
A Documentation and Assumptions for Potential Measures to Meet the HGA Attainment Shortfall
Proposed Appendix
A Documentation and Assumptions for Potential Measures to Meet the HGA Attainment Shortfall

Associated Rule Change Documentation

Rule Rule Log PDF WP
Utility Electric Generation in Ozone Nonattainment Areas (Adopted) 1999-055D-117-AI (DFW),
99056-117-AI (BPA)
Utility Electric Generation in Ozone Nonattainment Areas (Proposed) 1999-055D-117-AI (DFW),
99056-117-AI (BPA)
Cement Kilns (Adopted) 1999-046-117-AI &
1999-049-117-AI
Cement Kilns (Proposed) 1999-046-117-AI &
1999-049-117-AI

return to topReturn to top