You are here: Home Drinking Water Surface Water Treatment Plant Operations SWMOR Comprehensive Performance Evaluation

Comprehensive Performance Evaluation

FileComprehensive Performance Evaluation Request Form Example
The Comprehensive Performance Evaluation (CPE) Request form must be completed and submitted when an individual filter has confirmed effluent turbidity readings above 2.0 NTU on two separate occasions during any consecutive two months. The SWMOR spreadsheet automatically determines if a CPE is needed. This file is an example of a completed CPE Request form.
FileComprehensive Performance Evaluation Request Form and Instructions
The Comprehensive Performance Evaluation (CPE) Request form must be completed and submitted when an individual filter has confirmed effluent turbidity readings above 2.0 NTU on two separate occasions during any consecutive two months. The SWMOR spreadsheet automatically determines if a CPE is needed. This file contains the CPE Request form, an example of a completed CPE Request form, and instructions.
FileComprehensive Performance Evaluation Request Form
The Comprehensive Performance Evaluation (CPE) Request form must be completed and submitted when an individual filter has confirmed effluent turbidity readings above 2.0 NTU on two separate occasions during any consecutive two months. The SWMOR spreadsheet automatically determines if a CPE is needed.
Document Actions