Investigative Checklists for Waste
Criteria used by TCEQ investigators during site visits. Made available to the public as a courtesy so those investigated (routinely or due to a complaint) can know what the agency will look for.
Lists are in PDF files.
Industrial Hazardous Waste
- Dry Cleaner CEI
- IHW Boiler and Industrial Furnace
- IHW Boiler and Industrial Furnace Pre-Investigation
- IHW Boiler and Industrial Furnace Addendum
- IHW CEI General Facility
- IHW CEI Landfill
- IHW CEI Subpart AA
- IHW CEI Subpart BB
- IHW CEI Subpart CC
- IHW Complaint
- IHW Container-Storage Area
- IHW Existing Tanks
- IHW Focused Investigation for CESQG
- IHW Focused Investigation for Generation and Classification
- IHW Focused Investigation for LQG Container Storage Area
- IHW Focused Investigation for LQG Tanks
- IHW Focused Investigation for SQG Container Storage Areas
- IHW Focused Investigation for SQG Tanks
- IHW Forused Investigation for Class V UIC
- IHW Hydrogeologic
- IHW Importer of Record
- IHW Incinerator
- IHW Investigation—Equipment Monitoring and Sampling
- IHW Land Disposal Restrictions for Generator—TSD
- IHW New Tanks
- IHW Permit Compliance
- IHW Permitted Container-Storage Area
- IHW Permitted-Facility General Standards
- IHW Pre-Investigation
- IHW RCRA Interim Status CME Groundwater Checklist 2
- IHW RCRA Interim Status Facility CME Checklist 6 Section A
- IHW RCRA Interim Status Facility CME Checklist 6 Section B
- IHW RCRA Interim Status Facility CME Checklist 8
- IHW RCRA Interim Status Facility CME Groundwater Checklist 3
- IHW RCRA Permitted Facility CME Checklist 5
- IHW RCRA Permitted Facility CME Checklist 7 Section A
- IHW RCRA Permitted Facility CME Checklist 7 Section B
- IHW RCRA Permitted Facility CME Checklist 9
- IHW RCRA Permitted Facility CME Groundwater Checklist 4
- IHW Sample Analyses Results
- IHW Small-Quantity Tanks
- IHW Universal Waste Destination Facility CEI
- IHW Universal Waste Large-Quantity Handler CEI
- IHW Universal Waste Transporter CEI
- IHW Waste Transporter
Municipal Solid Waste
- MSW O and M
- MSW Asbestos
- MSW Closure
- MSW CME Checklist A Introduction
- MSW CME Checklist B Detection Monitoring
- MSW CME Checklist C Assessment Monitoring
- MSW CME Checklist D Corrective Action
- MSW CME Checklist E Groundwater Monitoring
- MSW Complaint Investigation
- MSW Compost—Facilities Which Require A Permit
- MSW Compost Checklist B—Facilities Which Require a Registration
- MSW Compost FAC—Permit and Registration Not Required
- MSW Focused Investigation for Landfill Gas
- MSW Focused Investigation for Leachate at Permitted Facility
- MSW Focused Investigation for Waste Screening at Permitted Facility
- MSW Groundwater O and M Part 1
- MSW Groundwater O and M Part 2
- MSW Groundwater
- MSW Investigation—Equipment Monitoring And Sampling
- MSW Landfill Gas
- MSW Medical-Waste Collection
- MSW Medical-Waste Generator
- MSW Medical Waste, Mobile Treatment
- MSW Medical Waste, On-Site Treatment
- MSW Medical-Waste Transporter
- MSW Record-Keeping Requirements
- MSW Recycling
- MSW Scrap-Tire Facility
- MSW Scrap-Tire Generator
- MSW Scrap-Tire Storage Site
- MSW Scrap-Tire Transporter
- MSW Site Operating Plan
- MSW Tire Transportation Facility
- MSW Tires Land Reclamation Project Using Tires (LRPUT)
- MSW Type 1–4 Landfill General Summary
- MSW Type 1–4 Landfill
- MSW Type 5 Processor—Part 1
- MSW Type 5 Processor—Part 2
- MSW Unauthorized Site
- MSW Used-Oil Closure
- MSW Used-Oil-Filter Handler
- MSW Used-Oil Handler: Burners of Off-Spec Oil
- MSW Used-Oil Handler: General Prohibition
- MSW Used-Oil Handler: Generators
- MSW Used-Oil Handler: Marketers
- MSW Used-Oil Handler: Processors-Refiners
- MSW Used-Oil Handler Transporters-Transferors
Petroleum Storage Tanks
- LPST Case-Status Investigation
- PST Abandonment, Removal, and Change-In-Service Investigation Report
- PST Common Carrier
- PST Complaint Investigation
- PST Energy Act–Focused Investigation
- PST EPA SOC
- PST Financial Assurance Record Review
- PST Focused Investigation—TXLED
- PST Full CEI #1 General Information
- PST Full CEI #2 Registration and Self Certification
- PST Full CEI #3 Spill and Overfill Prevention
- PST Full CEI #4 Corrosion Protection
- PST Full CEI #5 Financial Assurance
- PST Full Cei #6 Piping Release Detection
- PST Full CEI #7A Automatic-Tank Gauging and Investigation Control
- PST Full CEI #7B SIR
- PST Full CEI #7C Interstitial Monitoring
- PST Full CEI #7D Vapor Monitoring
- PST Full CEI #7E Groundwater Monitoring
- PST Full CEI #7F Manual Tank Gauging
- PST Full CEI #7G Monthly Tank Gauging
- PST Full CEI #7H ATG for Emergency Generator Tanks
- PST Full CEI #7I Secondary Containment Barrier
- PST Generic Other Violations
- PST Installation, Upgrade, and Repair Investigation Report
- PST Investigation—Equipment Monitoring and Sampling
- PST LPST Site Assessment Investigation
- Modified Compliance Evaluation Investigation
- PST Out-of-Service Checklist
- PST Stage I Investigation
- Stage I and II Test Observation—101, Vapor Space Manifold Test
- Stage I and II Test Observation—102, Pressure-Decay Test
- Stage I and II Test Observation—103, Dynamic Back-Pressure Test
- Stage I and II Test Observation—104, Flow-Rate-Determination Test
- Stage I and II Test Observation—105, Alternative Procedures, CARB TP 201.6C
- Stage I and II Test Observation—106, Alternative Procedures
- Stage I and II Test Observation—106, V L Ratio Test
- Stage I and II Test Observation—107, Healy Booted-Nozzle Test
- Stage I and II Test Observation—Equipment Specifications For All Tests
- Stage II Vapor-Recovery Investigation



