Outdated Title 30 TAC 117.510 - 570 Subchapter D, June 23, 1994

Outdated 30 TAC 117 and 31 TAC 117 rules, 31 TAC 117 date from 1972 and the rule changed to 30 TAC 117 in September 1993

Subchapter D Administrative Provisions

117.510 Compliance Schedule For Utility Electric Generation
117.520 Compliance Schedule For Commercial, Institutional, and Industrial Combustion Sources
117.530 Compliance Schedule For Nitric Acid and Adipic Acid Manufacturing Sources
117.540 Phased Reasonably Available Control Technology (RACT)
117.550 Standard Construction Permits for NOx RACT Projects
117.560 Rescission
117.570 Alternate Means of Compliance-Trading

117.510 Compliance Schedule For Utility Electric Generation

All persons affected by the provisions of the undesignated head in Subchapter B of this chapter (relating to Utility Electric Generation) shall be in compliance as soon as practicable, but no later than May 31, 1995 (final compliance date). Additionally, all affected persons shall meet the following compliance schedules and submit written notification to the executive director:

(1) no later than April 1, 1994, submit a plan for compliance in accordance with § 117.109 of this title (relating to Initial Control Plan Procedures);

(2) conduct applicable continuous emissions monitoring system (CEMS) or predictive emissions monitoring systems (PEMS) evaluations and quality assurance procedures as specified in § 117.113 of this title (relating to Continuous Demonstration of Compliance) according to the following schedules:

(A) for equipment and software required pursuant to 40 Code of Federal Regulations (CFR) 75, no later than January 1, 1995; and

(B) for equipment and software not required pursuant to 40 Code of Federal Regulations (CFR) 75, no later than May 31, 1995;

(3) install all nitrogen oxides (NOx) abatement equipment, implement all NOx control techniques and submit the results of the CEMS or PEMS performance evaluation and quality assurance procedures to the TNRCC no later than May 31, 1995;

(4) for units operating without CEMS or PEMS, conduct applicable tests for initial demonstration of compliance as specified in § 117.111 of this title (relating to Initial Demonstration of Compliance); and submit the results by April 1, 1994, or as early as practicable, but in no case later than May 31, 1995;

(5) for units operating with CEMS or PEMS and complying with the NOx emission limit on a rolling 30-day average, conduct the applicable tests for the initial demonstration of compliance as specified in § 117.111 of this title and submit the results of the applicable CEMS or PEMS performance evaluation and quality assurance procedures as specified in § 117.113 of this title (relating to Continuous Demonstration of Compliance) no later than July 31, 1995;

(6) for units operating with CEMS or PEMS and complying with the NOx emission limit in pounds per hour on a block one-hour average, conduct the applicable tests for the initial demonstration of compliance as specified in § 117.111 of this title and submit the results of the applicable CEMS or PEMS performance evaluation and quality assurance procedures as specified in § 117.113 of this title by May 31, 1995;

(7) conduct applicable tests for initial demonstration of compliance with the NOx emission limit for fuel oil firing, in accordance with § 117.111(d)(2) of this title, and submit test results within 60 days after completion of such testing; and

(8) no later than May 31, 1995, submit a final control plan for compliance in accordance with § 117.115 of this title (relating to Final Control Plan Procedures).

117.520 Compliance Schedule For Commercial, Institutional, and Industrial Combustion Sources All persons affected by the provisions of the undesig

nated head in Subchapter B of this chapter (relating to Commercial, Institutional, and Industrial Sources) shall be in compliance as soon as practicable, but no later than May 31, 1995 (final compliance date). All affected persons shall meet the following compliance schedules and submit written notification to the executive director:

(1) submit a plan for compliance in accordance with § 117.209 of this title (relating to Initial Control Plan Procedures) according to the following schedule:

(A) for major sources of nitrogen oxides (NOx) which have units subject to emission specifications under this chapter, submit an initial control plan for all such units no later than April 1, 1994;

(B) for major sources of NOx which have no units subject to emission specifications under this chapter, submit an initial control plan for all such units no later than September 1, 1994; and

(C) for major sources of NOx subject to either subparagraphs (A) or (B) of this paragraph, submit the information required by § 117.209(c)(6), (7), and (9) of this title no later than September 1, 1994;

(2) install all NOx abatement equipment and implement all NOx control techniques no later than May 31, 1995;

(3) for units operating without continuous emissions monitoring system (CEMS) or predictive emissions monitoring systems (PEMS), conduct applicable tests for initial demonstration of compliance as specified in § 117.211 of this title (relating to Initial Demonstration of Compliance); and submit the results by April 1, 1994, or as early as practicable, but in no case later than May 31, 1995;

(4) for units operating with CEMS or PEMS and complying with the NOx emission limit on a rolling 30-day average, conduct the applicable tests for the initial demonstration of compliance as specified in § 117.211 of this title and submit the results of the applicable CEMS or PEMS performance evaluation and quality assurance procedures as specified in § 117.213 of this title (relating to Continuous Demonstration of Compliance) no later than July 31, 1995;

(5) for units operating with CEMS or PEMS and complying with the NOx emission limit in pounds per hour on a block one-hour average, conduct the applicable tests for the initial demonstration of compliance as specified in § 117.211 of this title and submit the results of the applicable CEMS or PEMS performance evaluation and quality assurance procedures as specified in § 117.213 of this title by May 31, 1995; and

(6) no later than May 31, 1995, submit a final control plan for compliance in accordance with § 117.215 of this title (relating to Final Control Plan Procedures).

117.530 Compliance Schedule For Nitric Acid and Adipic Acid Manufacturing Sources

All persons affected by the provisions of the undesignated head (relating to Adipic Acid Manufacturing) in Subchapter C of this chapter or the provisions of the undesignated head (relating to Nitric Acid Manufacturing) in Subchapter C of this chapter shall be in compliance as soon as practicable, but no later than May 31, 1995 (final compliance date). All affected persons shall meet the following compliance schedules and submit written notification to the executive director:

(1) no later than April 1, 1994, submit a control plan for compliance as specified in § 117.309 of this title (relating to Control Plan Procedures) and § 117.409 of this title (relating to Control Plan Procedures);

(2) conduct applicable continuous emissions monitoring system (CEMS) or predictive emissions monitoring systems (PEMS) performance evaluation and quality assurance procedures as specified in § 117.313 of this title (relating to Continuous Demonstration of Compliance) and § 117.413 of this title (relating to Continuous Demonstration of Compliance); provide previous testing documentation for any claimed test waiver as allowed by § 117.311(d) of this title (relating to Initial Demonstration of Compliance) or § 117.411(d) of this title (relating to Initial Demonstration of Compliance); and conduct applicable initial demonstration of compliance testing as specified in § 117.311 and § 117.411 of this title, by:

(A) no later than January 1, 1994, for affected facilities not performing process modification or installation of a CEMS or PEMS device as part of the control plan specified in § 117.309 and § 117.409 of this title; and

(B) no later than May 31, 1995, for affected facilities performing process modification or installation of a CEMS or PEMS device as part of the control plan specified in § 117.309 and § 117.409 of this title;

(3) within 60 days after the applicable date specified in paragraph (2)(A) or (B) of this section, submit the results of CEMS or PEMS performance evaluation and quality assurance procedures and the results of initial demonstration of compliance testing specified in paragraph (2) of this section.

117.540 Phased Reasonably Available Control Technology (RACT)

The owner or operator affected by the provisions of this chapter (relating to Control of Air Pollution from Nitrogen Compounds) who determines that compliance by May 31, 1995, is not practicable may submit a petition for phased RACT. The process for submitting a petition and receiving approval shall be based on the following.

(1) The petition shall be submitted by October 1, 1994, or as soon as possible after such date upon a demonstration by the owner or operator that the petition was not submitted by October 1, 1994 due to unforeseen circumstances.

(2) The owner or operator of the affected unit or units shall submit information in the petition to the commission and a copy to the EPA regional office in Dallas which will demonstrate all of the following:

(A) compliance by May 31, 1995 is impracticable due to the unavailability of nitrogen oxides (NOx) abatement equipment, engineering services, or construction labor; system unreliability; manufacturing unreliability; equipment unreliability; or other technological and economic factors as the commission determines are appropriate;

(B) there is a proposed stage-by-stage program for compliance and clearly specified compliance milestones for each unit;

(C) there is a commitment to implement the portion of the phased RACT petition that can be implemented by May 31, 1995; and

(D) the final compliance date specified in the petition shall be as soon as practicable, but in no case later than August 31, 1996, except as approved by the executive director.

(3) Each petition for phased RACT shall contain the information required by at least one of the following criteria.

(A) If compliance by May 31, 1995 is impracticable due to the unavailability of NOx abatement equipment, engineering services, or construction labor, the following information shall be included in the petition for phased RACT:

(i) a list of the company names, addresses, and telephone numbers of vendors who are qualified to provide the services and equipment capable of meeting the applicable emission limitation under this chapter and who have been contacted to obtain the required services and equipment. A copy of the request for bids along with the dates of contact shall also be provided to show a good-faith effort to obtain the required services and equipment necessary to meet the requirements of this chapter by May 31, 1995; and

(ii) copies of responses from each of the vendors listed in clause (i) of this subparagraph showing that they cannot provide the necessary services and install the appropriate equipment in time for the unit to comply by May 31, 1995. Such responses shall include the reasons why the services cannot be provided and why the equipment cannot be installed in a timely manner.

(iii) if work on the project will be provided by the owner or operator, the petition for phased RACT shall include documentation that the necessary NOx abatement equipment, engineering services, or construction labor could not be obtained in a timely manner from either in-house or external sources, as well as a detailed design or installation schedule for the required services or equipment to be provided by the owner or operator.

(B) If compliance by May 31, 1995 is impracticable due to system unreliability for sources in the utility industry, defined as the inability or threatened inability of a utility grid system to fulfill obligations to supply electric power, the following information shall be included in the petition for phased RACT:

(i) standard load forecasts, based on standard forecasting models available throughout the utility industry, applied to the period May 31, 1993 - May 30, 1995;

(ii) outage schedule for all units in the utility grid to which the subject unit belongs; and

(iii) specific reasons why an outage for the purpose of installing NOx emission control equipment cannot be scheduled by May 31, 1995.

(C) If compliance by May 31, 1995 is impracticable due to manufacturing unreliability, defined as the inability or threatened inability of a source to fulfill contractual obligations to supply a product or products, the following information shall be included in the petition for phased RACT:

(i) certification by an authorized official of the company showing manufacturing obligations for which the company is contractually obligated. Manufacturing obligation information shall include copies of contracts signed by an authorized official of the company or similar documentation and shall exclude commercially sensitive information;

(ii) historical and planned outage schedules for all units whose manufacturing capacity would be affected by the outage of the affected unit; and

(iii) specific reasons why an outage for the purpose of installing NOx emission control equipment cannot be scheduled by May 31, 1995.

(D) If compliance by May 31, 1995 is impracticable due to equipment unreliability, defined as the reduced availability and operating reliability of a unit resulting from the operation of NOx control equipment on that unit, the following information shall be included in the petition for phased RACT:

(i) specific reasons why the new NOx control equipment will reduce the current reliability of the operating unit;

(ii) historical availability and forced outage data expressed as annual percentages and the differences in each expected with the new NOx control equipment. Availability is defined as the sum of hours the equipment is in service plus the hours the equipment is not in service, but available for service, divided by the number of hours in the reporting period. A forced outage is defined as down time which occurs as a result of a trip, emergency shutdown, or unplanned maintenance;

(iii) most recent operating history available from the vendor for the new NOx control equipment, including actual test operating hours, actual load during testing, and specific problems that resulted in lost availability; and

(iv) reasons why the NOx control technology is not considered proven including vendor test and commercial operating data, if available from the vendor.

(E) If compliance by May 31, 1995 is impracticable due to other technical factors, the petition for phased RACT shall contain such documentation as the executive director establishes is appropriate for such technical factors.

(F) If compliance by May 31, 1995 is unreasonable due to economic considerations, excluding the time value of money, the petition for phased RACT shall contain the following information showing comparisons of the cost of compliance by May 31, 1995 and the cost of compliance by the final compliance date specified in the petition:

(i) the costs of additional outages, if applicable, necessitated by compliance with the emission specifications of this chapter by May 31, 1995, as demonstrated by comparison to costs of actual historical and planned outages;

(ii) comparisons of the cost of obtaining the NOx abatement equipment, engineering services, or construction labor necessary to comply by May 31, 1995, and the cost of obtaining the NOx abatement equipment, engineering services, or construction labor by the final compliance date specified in the petition. Copies of legally binding contracts, signed by an authorized official of the company, shall be submitted to document these costs. If the required NOx abatement equipment, engineering services, or construction labor will be provided by the owner or operator, as provided for in paragraph (4) of this subsection, certification by an authorized official of the company may be submitted in lieu of contracts to document these costs; or

(iii) other economic factors, documented as the Executive Director establishes is appropriate for such economic factors.

(4) All petitions for phased RACT shall include copies of legally binding contracts with the primary vendors for each project, signed by an authorized official of the company, showing a detailed design or installation schedule for the required services or equipment to be provided by that vendor, with a completion date no later than August 31, 1996, except as approved by the executive director. Any commercially sensitive financial information or trade secrets should be excised from the contracts.

(5) Within 30 days of receiving a petition for phased RACT, the Executive Director shall inform the applicant in writing that the petition is complete or that additional information is required. If the petition is deficient, the notification shall state any additional information required. The requested information correcting the deficiency shall be received by the Executive Director within 30 days of the date of the letter notifying the applicant of the deficiency.

(6) The executive director shall approve or deny the petition within 90 days of receiving an administratively complete phased RACT petition. The executive director shall approve a petition for phased RACT if the executive director determines that compliance is not practicable by May 31, 1995, because of either the unavailability of nitrogen oxides abatement equipment, engineering services, or construction labor; system unreliability; manufacturing unreliability; equipment unreliability; or other technological and economic factors as the executive director determines are appropriate.

(7) Any person affected by the executive director's decision to deny a petition for phased RACT or to deny a revision to an approved phased RACT petition may appeal the decision to the commission within 30 days after the date of the decision. Such appeal is to be taken by written notification to the executive director. Section 103.71 of this title (relating to Request for Action by the Commission) should be consulted for the method of requesting Commission action on the appeal. Approved petitions for phased RACT may be revised by the executive director upon a showing of just cause by the applicant.

(8) Approval of a phased RACT schedule by the TNRCC does not waive any applicable federal requirements or eliminate the need for approval by EPA.

(9) The holder of an approved phased RACT determination shall comply with each specified compliance milestone and each date for compliance provided in the approved petition, as well as any other condition established in the approval.

(b) The executive director shall initiate a reevaluation of the final compliance dates specified in this undesignated head (relating to Administrative Provisions) one year after the adoption of this chapter. The executive director shall evaluate the practicability of all sources complying with § 117.105 (relating to Emission Specifications), § 117.107 (relating to Alternative System-Wide Emission Specifications), § 117.205 (relating to Emission Specifications), § 117.207 (relating to Alternative Plant-Wide Emission Specifications), § 117.305 (relating to Emission Specifications), § 117.405 (relating to Emission Specifications) and § 117.223 (relating to Source Cap) of this title by May 31, 1995. The executive director shall base the evaluation on the information contained in the control plans required by § § 117.109, 117.209, 117.309 and 117.409 of this title (relating to Initial Control Plan Procedures). In evaluating the practicability of compliance by May 31, 1995, the executive director shall take into consideration the availability of NOx abatement equipment, engineering services or construction labor; system unreliability; manufactuirng unreliability; equipment unreliability; or other technological and economic factors as the TNRCC determines are appropriate. Within 15 months after adoption of this chapter, the executive director shall publish notice in the Texas Register of the intent to either retain or extend by rulemaking the final compliance dates of this undesignated head.

(c) The executive director may approve the use of a MERC to achieve NOx emissions reductions equivalent to those required by this chapter, on an interim basis from May 31, 1995 to the date of final compliance, for a period not to exceed 36 months. Any plan involving the use of a MERC may be approved if the executive director determines that it conforms to the provisions of § 117.570 of this title (relating to Trading) and § 114.29 of this title (relating to Accelerated Vehicle Retirement Program). Executive director approval does not necessarily constitute satisfaction of all federal requirements, nor eliminate the need for approval by EPA.

117.550 Standard Construction Permits for NOx RACT Projects

(a) In lieu of complying with the permitting requirements of Chapter 116 of this title (relating to Control of Air Pollution by Permits for New Construction or Modification), any person who installs nitrogen oxides (NOx) abatement equipment or implements a NOx control technique in order to comply with the requirements of this chapter shall be entitled to a standard permit under the following conditions.

(1) The change must not result in an increase of the unit's or the facility's production capacity, as documented in accordance with § § 117.119, 117.219, 117.319, and 117.419 of this title (relating to Notification, Recordkeeping, and Reporting Requirements), as applicable, except in the following cases.

(A) For gas turbines, any increase in capacity must be a direct result of the requirement to implement controls on existing units required to meet emission limitations required by § 117.105 of this title (relating to Emission Specifications), § 117.107 of this title (relating to Alternative System-Wide Emission Specifications), § 117.205 of this title (relating to Emission Specifications), § 117.207 of this title (relating to Alternative Plant-Wide Emission Specifications), and § 117.580 of this title (relating to Source Cap).

(B) For permitted equipment other than gas turbines, any increase in capacity must be a direct result of the requirement to implement controls on existing units previously permitted in accordance with the requirements of Chapter 116 of this title that are required to meet emission limitations required by § § 117.105, 117.107, 117.205, 117.207, 117.305, 117.405, or 117.580 of this title. Such units must remain in compliance with all terms and limitations of their permits and cannot utilize the increase in production capacity without satisfying the permitting requirements of Chapter 116 of this title.

(C) For grandfathered equipment other than gas turbines, any increase in capacity must be a direct result of the requirement to implement controls on existing units that are required to meet emission limitations required by § § 117.105, 117.107, 117.205, 117.207, 117.305, 117.405, or 117.580 of this title. Such grandfathered units cannot utilize the increase in production capacity without satisfying the permitting requirements of Chapter 116 of this title.

(2) Any emission increase of an air contaminant other than NOx must be a direct result of the requirement to install NOx abatement equipment or implement a NOx control technique and shall comply with the emission specifications of § § 117.105, 117.107, 117.205, 117.207, 117.305, 117.405 of this title; § § 117.121, 117.221, 117.321, 117.421 of this title (relating to Alternative Case Specific Specifications); or § 117.580 of this title, as applicable.

(3) If installation of NOx abatement equipment or implementation of a NOx control technique will result in a significant net increase (for purposes of this chapter, "significant net increase" for nonattainment pollutants means an increase of emissions equal to or greater than the amount specified in the MAJOR MODIFICATION column of Table I in § 101.1 of this title (relating to Definitions), and for attainment pollutants, the definition in 40 Code of Federal Regulations 52.21(b)(23)) in representative actual annual emissions of any criteria pollutant over levels used for that source in the most recent air quality impact analysis in the area, a person claiming a standard permit shall submit information sufficient to demonstrate that the following conditions will be met:

(A) considering the NOx reductions that will result from implementation of the requirements of this part, the emissions increase shall not cause or contribute to a violation of any national ambient air quality standard;

(B) the emissions increase shall not cause or contribute to a violation of any Prevention of Significant Deterioration (PSD) of air quality regulation increment; and

(C) the emissions increase shall not cause or contribute to a violation of a visibility limitation.

(4) Emission increases eligible for a standard permit shall:

(A) be quantified in the initial compliance plan; and

(B) be tested as required by § § 117.111, 117.211, 117.311, and 117.411 of this title (relating to Initial Demonstration of Compliance), as applicable.

(5) Notice of the intent to be covered by the standard permit must be accompanied by a carbon monoxide (CO) minimization plan, describing efforts to be taken to minimize increases in CO emissions that will result from installing NOx abatement equipment or implementing a NOx control technique.

(6) Notice of the intent to be covered by a standard permit shall be filed with the agency before a standard permit can be claimed. Such notice should be filed on or before the date for filing an initial control plan as required by § § 117.109, 117.209, 117.309, and 117.409 of this title (relating to Control Plan Procedures), as applicable. Information required under paragraph (3) of this subsection shall be submitted no later than 14 days prior to the commencement of construction for the installation of NOx abatement equipment or implementation of a NOx control technique.

(b) Unless notified by the Executive Director to the contrary, any person who submits notice of the intent to be covered by the standard permit is authorized to emit the increase in the quantity of pollutants emitted or change in the type of pollutants emitted under the terms and conditions of this permit 14 days after the date that the notice of intent is postmarked, if all required submissions have been made. The Executive Director may deny coverage under this permit at any time upon a determination that the terms and conditions of this permit are not being met and may require submittal of a permit or permit amendment application for a permit under Chapter 116 of this title. Emissions covered by a standard permit must comply with all rules and regulations of the TNRCC.

(c) For purposes of compliance with the PSD and nonattainment new source review provisions of Chapter 116 of this title, an increase that satisfies the requirements for a standard permit shall not constitute a physical change or a change in the method of operation. For purposes of compliance with the Standards of Performance for New Stationary Sources regulations promulgated by EPA in 40 CFR 60.14, an increase that satisfies the requirements for a standard permit shall satisfy the requirements of 40 CFR 60.14(e)(5).

(d) All representations made in association with a notice of intent to claim a standard permit become conditions upon which the NOx abatement equipment covered by the standard permit shall be constructed and operated or the NOx control technique implemented. It shall be unlawful for any person to vary from such representations if the change in conditions will affect that person's right to claim a standard permit under this section. Any change in conditions such that a person is no longer eligible to claim a standard permit under this section requires submission of a permit or permit amendment application for a permit under Chapter 116 of this title.

117.560 Rescission

If, after reviewing the results of the Urban Airshed Model for a nonattainment area, the Texas Natural Resource Conservation Commission (TNRCC) determines after conducting public hearings that the additional reductions of nitrogen oxides (NOx) in the nonattainment area would not contribute to attainment of the National Ambient Air Quality Standards for ozone in that nonattainment area, then the TNRCC shall have the executive director submit such findings and results to the United States Environmental Protection Agency (EPA) Administrator for a determination under the 1990 Federal Clean Air Act Amendments § 182(f). If the EPA Administrator approves the TNRCC's finding, then the requirements of this chapter shall be reproposed in rulemaking to address the findings of the Administrator as to the applicable NOx requirements.

117.570 Alternative Means of Compliance Trading

(a) The executive director may approve alternate means of compliance with this chapter (relating to Control of Air Pollution From Nitrogen Compounds), including the use of emission reduction credits. The alternative compliance plan may include the trading of emission reduction credits between sources owned by the same company as well as between sources owned by different companies. Any alternative compliance plan may be approved if the executive director determines that it will provide substantially equivalent emission reductions to those required by this chapter and satisfactory means for determing on going compliance with the approved alternative compliance plan, including monitoring. Executive director approval does not necessarily constitute satisfaction of all federal requirements, nor eliminate the need for approval by the US EPA of any alternate method.

(b) The executive director may consider the establishment of a facility cap as an alternate means of compliance with this chapter. A facility cap plan submitted under this provision may be approved if the executive director determines that it will provide substantially equivalent emission reductions to those required by this chapter and establishes satisfactory means for determining ongoing compliance with the facility cap, including appropriate monitoring and recordkeeping requirements. Executive director approval does not necessarily constitute satisfaction of all federal requirements, nor eliminate the need for approval by EPA of any alternate method.