Encycle Facility Documents
Encycle Document Categories
Assessment Documents
Closure Documents
Correspondence Documents
Demolition and Asbestos Abatement Documents
Maps
Waste Profile Information
Remediation Phase Documents
Assessment Documents
- RCRA Facility Investigation Report, Volume I of III (8/13/2002)
- RCRA Facility Investigation Report, Volume II of III (8/13/2002)
- RCRA Facility Investigation Report, Volume III of III (8/13/2002)
- Phase II RCRA Investigation Report (5/09/2003)
- Phase II RCRA Investigation Report Addendum (12/3/2003)
- Baseline Risk Assessment, Volume I of II (4/14/2004)
- Baseline Risk Assessment, Volume II of II (4/14/2004)
- Building Structural Integrity Assessment Report (3/15/2011)
Closure Documents
- Final Closure Certification Report - Facility No. 3, Non-Permitted Units (4/20/2004)
- Final Closure Certification Report - Facility No. 1, Non-Permitted Units (9/23/2004)
- Final Closure Certification Report - East and West Lagoons (10/14/2004)
- Final Closure Certification Report - Lettered Bins, Building C, Volume I of II (11/05/2004)
- Final Closure Certification Report - Lettered Bins, Building C, Volume II of II (11/05/2004)
- Final Closure Certification Report - Facility No. 2, Non-Permitted Units (11/09/2004)
- Final Closure Certification Report - Receiving Building (Bldg B) and Facility 1 & 3 Container Storage Areas (11/11/2004)
- Work Corrective Measures Study & Corrective Measures Implementation Plan (5/27/2005)
Correspondence Documents
- Encycle CMS and CMI Approval (12/16/2005)
- TCEQ Letter to Encycle Trustee (1/10/2011)
- TCEQ Letter of Understanding (2/07/2011)
- TCEQ Letter and EPA Comments to the Asbestos Abatement Project Specifications (2/11/2011)
- EPA Final Letter to Encycle Attorney (3/01/2011)
- Letter from TCEQ regarding various demolition workplans (4/15/2011)
- TCEQ CMS Approval Letter (Exhibit B) (12/16/05)
Demolition and Asbestos Abatement Documents
Contract
Exhbiits and Attachments to Contract
- Exhibit A (06/18/2010)
- Exhbiit A-3 (8/13/2010)
- Exhibit A-4 (8/13/2010)
- Exhibit A-5 Part 1 Part 2 (8/13/2010)
- Exhibit A-7 Part 1 Part 2 (8/13/2010)
- Exhibit A-8 (8/13/2010)
- Exhibit A-9 (8/13/2010)
- Exhibits to Document 318 (8/13/2010)
Motions and Associated Contract Documents
- Encycle Services Agreement with Energy Renewal (10/15/2010)
- Encycle Motion for Demololition Contract (11/08/2010)
- Fully Executed Letter (1/24/2011)
- Order Approving Modification of Master Service Agreement (2/14/2011)
Workplans
Air Monitoring
- Encycle Air Monitoring During Demolition (10/18/2010)
- Revised Air Monitoring Program - Encycle Demolition Project (4/07/2011)
- Revised Air Monitoring Program - Encycle Demolition Project (5/20/2011)
- Revised Air Monitoring Program - Encycle Demolition Project - Final(5/31/2011)
Asbestos Abatement
- Attaachment 2, Photographs (11/27/2006)
- Asbestos Inspection Results (12/14/2006)
- Encycle Asbestos Inspection Report (12/14/2006)
- Figure 1 - Building Location Map
- Figure 2 - Asbestos Sample Locations
- Asbestos Abatement Design
- Figure A-2, Buildings and Structures to be demolished
- Revised Asbestos Abatement Work Plan - Final
- Asbestos Abatement Project Specifications
- Approval of the Asbestos Abatement Project Specifications (4/08/2011)
- Asbestos Specifications Revision (4/29/11)
Other Plans
- Quality Control/Quality Assurance Plan (12/17/2010) - Final
- Hazard Communication Plan (12/17/2010)
- Hazard Communication Plan Revised (4/29/11)
- Health and Safety Plan (HASP) (12/17/2010) - Final
- Health and Safety Plan Revised (4/29/11)
- Traffic Control Plan (12/20/2010) - Final
- Stormwater Polution Prevention Plan (SWP) (3/01/2011)
- Notice of Intent - Stormwater Discharge Permit (4/06/2011)
- Stormwater Polution Prevention Plan Revised (4/29/11)
- Wind Dust Monitoring Plan (3/01/2011)
- Wind Dust Monitoring Plan Revised (4/29/11)
- ASARCO/Encycle Demolition Work Plan (3/11/2011)
- Addendum to the Demolition Work Plan (4/07/2011)
- Addendum to the Demolition Work Plan Revised (4/29/11)
- Work Sequence and Schedule (4/08/2011)
- Work Sequence and Schedule Revised (6/10/11)
Maps
Copies of maps can be requested from the TCEQ Central File Room, 12100 Park 35 Circle, Building E, First Floor, Room 103, Austin TX 78753, Phone: 512-239-2900, Fax: 512-239-1850, E-mail: cfrreq@tceq.texas.gov.
Waste Profile Information
- El Centro - Class II Waste (1/11/2011)
- Tessman Road - Friable ACM (1/11/2011)
- TX Molecular - Liquid Waste (1/11/2011)
- US Ecology - Hazardous Waste (1/11/2011)
Remediation Phase Documents
Contracts
Master Services Agreement (09/11/12)
Exhibits and Attachments to Contract
Encycle Soil Remediation Specifications (Exhibit A) (09/11/12)
Figures 1 - 7
Tables 1 - 6
Work Plans
CMS-CMI Plan
Work Corrective Measures Study & Corrective Measures Implementation Plan
CMS CMI Addendum -West Cell House (final)
CMS-CMI Addendum - Verification Soil Sampling (final)
Stormwater Polution Prevention Plan (Exhibit D)
Traffic Control Plan (Exhibit E)
Hazard Communication Plan (Exhibit F)
Soil Remediation Contractor Weekly Reporting (Exhibit G)
Air Monitoring
Wind Monitoring and Dust Suppression Plan (Exhibit C)
Other Plans
COPC Assessment Work Plan (final)
Lettered Bins Building Work Plan (final)