Jones Road Remedial Investigation Documents
A download page specifically for the Jones Road Groundwater Plume site
Remedial Investigation Document
Remedial Investigation Report
Figures
Tables
Appendix A - Reports
1. AEC
2. Referenced Geo-Tech Reports
3. Referenced Shaw Reports
- BLRA
- Chicot Groundwater Elevation Data
- Chicot Well Install
- CPT
- CSM
- Elevation and Position Surveys and Maps
- Geoprobe
- Groundwater Elevation Measurement
- GW Model ID Report
- Inorganic GW Quality Comparison
- Pilot Test Work Plan
- Rotosonic
- Treatability Study
- Vapor Instrusion Study
- Water Well Inventory Survey
Appendix B
Appendix C
Appendix D
Appendix E
|
Misc
|
2003
|
2004
|
2005
|
2006
|
2007
|
2008
|
| All Soil | CPT 2003 | February | February | February | February | February |
| Rotosonic | August | March | May | May | May | May |
| Metals 2002 | CPT September | May | August | July | August | |
| Soil 2001-2002 | GP October | August | November | GP July | November | |
| VOCs 2002 | November | CPT August | August | |||
| GW 2000 - 2003 | November | November |



