<?xml version="1.0" encoding="utf-8" ?>
<rdf:RDF xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:syn="http://purl.org/rss/1.0/modules/syndication/" xmlns="http://purl.org/rss/1.0/">




    



<channel rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/gallery/RSS">
  <title>Texas American Oil Photo Gallery</title>
  <link>http://www.tceq.texas.gov</link>

  <description>
    
      A collection of photos from the Texas American Oil state Superfund site.
    
  </description>

  

  
            <syn:updatePeriod>daily</syn:updatePeriod>
            <syn:updateFrequency>1</syn:updateFrequency>
            <syn:updateBase>2011-08-17T01:01:35Z</syn:updateBase>
        

  <image rdf:resource="http://www.tceq.texas.gov/logo.png" />

  <items>
    <rdf:Seq>
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo1" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo2" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo4" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo5" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo7" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo8" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo9" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo10" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo11" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo12" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo13" />
      
      
        <rdf:li rdf:resource="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo14" />
      
    </rdf:Seq>
  </items>

</channel>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo1">
    <title>Asphalt Covered Contaminated Soil</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo1</link>
    <description>Hidden underneath the asphalt layer was as much as six feet of contaminated soil.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:48Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo2">
    <title>Contamination Penetrated As Deep As Six Feet</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo2</link>
    <description>The remediation contractor excavated as deep as six feet to get below the layers of contamination.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:49Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo4">
    <title>PCB-contaminated Soil And Concrete Was Transported Off-site</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo4</link>
    <description>The excavated material was loaded into containers for removal to an approved disposal site.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:49Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo5">
    <title>Tank Used To Hold Liquids Pending Analysis</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo5</link>
    <description>Collected liquids from the site were put into the former frac tank, with the entire batch to be analyzed and classified as cleanup neared completion.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:50Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo7">
    <title>Concrete Broken And Removed To Reach Soil</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo7</link>
    <description>In many places, 6 to 8 inches of concrete had to be broken up before contaminated soil could be excavated.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:50Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo8">
    <title>Some Soil Was Treated On-site</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo8</link>
    <description>Excavated soil that could be stabilized, and re-used on-site, was stockpiled. The excavating also uncovered numerous buried barrels.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:51Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo9">
    <title>In Places, Soil Was Excavated to Bedrock</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo9</link>
    <description>In some portions of the site, it was necessary to excavate all of the soil cover down to bedrock to remove the contamination.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:30:00Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo10">
    <title>A Water Truck Was Kept Ready for Dust Control</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo10</link>
    <description>The remediation contract called for wetting down the surfaces when the wind started to blow, to keep pollutants from becoming airborne and being spread off-site.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:30:00Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo11">
    <title>Cement Was Used To Stabilize The Replacement Soil</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo11</link>
    <description>The silo at the right side of the photo contains cement, which was mixed with the stockpiled dirt to bond the contamination. The mixture was then spread over the excavation and compacted. The bonding and compaction will prevent runoff from carrying contaminants as was the case before this remedial action.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:52Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo12">
    <title>A Temporary Dam Caught Stormwater Runoff</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo12</link>
    <description>Excavation temporarily exposed the contaminated soil, and rains could wash contamination into the creek. The dam blocked the creek and captured the runoff before it spread the contamination across adjoining properties.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:54Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo13">
    <title>Treated And Stabilized Soil Was Spread Over The Excavation</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo13</link>
    <description>The remedial action equipment mixed cement with the soil to bond the contaminants. The mixture was then spread in the excavation and compacted.</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:55Z</dc:date>
    <dc:type>Image</dc:type>
  </item>


  <item rdf:about="http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo14">
    <title>Air Monitor Stations At Property Line</title>
    <link>http://www.tceq.texas.gov/remediation/superfund/photo_gallery/txamer/photo14</link>
    <description>Air monitoring stations are located at five different points along the site boundary. They test the air traveling off-site for lead, chloroform, and polychlorinated biphenyls (PCBs).</description>
    
    <dc:publisher>No publisher</dc:publisher>
    <dc:creator>Robin Maiorisi</dc:creator>
    <dc:rights></dc:rights>
    
    <dc:date>2011-08-30T18:28:55Z</dc:date>
    <dc:type>Image</dc:type>
  </item>





</rdf:RDF>
