You are here: Home Water Quality Total Maximum Daily Load Program Projects River Basins with TMDL Projects TMDL Projects in the San Antonio River Basin

TMDL Projects in the San Antonio River Basin

Get information about TMDL projects in the San Antonio River Basin (Segments 19XX).

Topics Under This Category:
Lower Leon Creek: A TMDL Project for Bacteria and Dissolved Oxygen
An inactive project to develop TMDLs and restore the safety of recreation and the habitat for aquatic life in Lower Leon Creek
Lower San Antonio River: A TMDL Project for Bacteria
A current project to develop and implement TMDLs that reduce bacteria concentrations. The total maximum daily loads are adopted. The implementation plan is in development.
Upper San Antonio River: A TMDL Project for Bacteria
A current project to develop and implement TMDLs that reduce bacteria concentrations
Document Actions
Public Comment Requested

On proposed drafts of three TMDLs and their implementation plan for the Carters Creek Watershed. The public comment period ends at midnight, May 28, 2012.