Skip to content. | Skip to navigation

Personal tools

Navigation

Questions or Comments:
tmdl@tceq.texas.gov
You are here: Home / Water Quality / Total Maximum Daily Load Program / Projects / Houston Bacteria

Houston-Galveston Region BIG: Implementing a Plan to Protect Recreational Uses

The goal of this project is to reduce bacteria levels in waterways of the Houston area to make them safer for recreation. The stakeholders of the Bacteria Implementation Group (BIG) and the TCEQ developed total maximum daily loads (TMDLs) and their Implementation Plan, which together are the road map to improving water quality. The TCEQ has adopted the TMDLs and approved the Implementation Plan.
Lake Houston Wilderness ParkBuffalo BayouClear Creek

visual spacer

back arrow Back to TMDL Projects

arrow_red.jpg Watch the BIG video Exit the TCEQ on YouTube. The BIG is a diverse group of committed and concerned people, representing a cross-section of concerned citizens from many disciplines. The group works for better quality water in the 2,200 square-mile area covered by their plan.

Houston-Galveston BIG Project Navigation

Other Project Pages:

arrow_red.jpgStatus and Activities

arrow_red.jpgImplementation Plan and TMDLs

The road map for restoring water quality

arrow_red.jpgReports and Other Documents

Overview

Water quality testing found that bacteria concentrations are elevated in numerous waterways in the Houston–Galveston region. High bacteria concentrations might pose a risk to people who swim or wade in natural waters. Swimming and wading are called “contact recreation” in the state’s standards for water quality; the term refers to all recreation in which people are likely to swallow natural waters.

The goal of this project is to reduce bacteria concentrations and protect recreational safety. This project includes 72 TMDLs for 60 waterway segments in 10 counties. The project area is 2,204 square miles including all or part of 56 cities and a population of about four million people.

Watershed Counties: Brazoria, Harris, Fort Bend, Grimes, Liberty, Montgomery, San Jacinto, Walker, and Waller

Parameter: Bacteria

River Basin: San Jacinto, San Jacinto–Brazos Coastal

Segments: 1004E, 1006D, 1006I, 1006F, 1006H, 1006J, 1007B, 1007C, 1007D, 1007E, 1007F, 1007G, 1007H, 1007I, 1007K, 1007L, 1007M, 1007N, 1007O, 1007R, 1008, 1008H, 1009, 1009C, 1009D, 1009E, 1010, 1011, 1013, 1013A, 1013C, 1014, 1014A, 1014B, 1014E, 1014H, 1014K, 1014L, 1014M, 1014N, 1014O, 1016, 1016A, 1016B, 1016C, 1016D, 1017, 1017A, 1017B, 1017D, 1017E, 1101, 1101A, 1101B, 1101C, 1101D, 1101E, 1102, 1102A, 1102B, 1102C, 1102D, 1102E, and 1102G

return to topReturn to top

Get Involved

The Bacteria Implementation Group (BIG) Exit the TCEQ is a regional governing body whose creation was facilitated by the Houston-Galveston Area Council (H-GAC). The BIG was formed to develop and implement a regional plan to reduce bacteria concentrations in impaired lakes, bayous, and streams in the Houston metropolitan area.

The BIG is coordinating public participation in improving Houston-area waterways. Meetings of the BIG are open to everyone. Meeting records are available on the BIG’s website Exit the TCEQ.

Meetings update.gif

BIG Annual Meeting
May 26, 2015
1:00 to 4:00 PM
Houston-Galveston Area Council
Conference Room B

Please join  BIG partners in discussing efforts to implement their plan to reduce bacteria in waterways of the Houston-Galveston Region. Topics for the meeting include the 2015 annual implementation report and regional TMDL projects. The BIG will also conduct routine business on implementation efforst, membership, and the addition of watersheds. An agenda will be posted to the BIG website.

Map to H-GAC offices Exit the TCEQ

Business Meetings

Business meetings are held twice annually, at the H-GAC offices Exit the TCEQ. See the BIG’s website Exit the TCEQ for more information about work groups and steering committee meetings.

return to topReturn to top

Partners

San Jacinto River Authority
Houston-Galveston Area Council
Texas State Soil and Water Conservation Board
Texas Commission on Environmental Quality
Harris County
Montgomery County
Harris County Flood Control District
Harris County Soil & Water Conservation District #442
Buffalo Bayou Partnership
City of Conroe
City of Houston
City of League City
City of Webster
Cypress Creek Flood Control Coalition
Nottingham Country

Municipal Utility District
Gulf Coast Waste Disposal Authority
Bayou Preservation Association
Galveston Bay Foundation
Greater Houston Partnership
Houston Audubon Society
Dodson & Associates, Inc./HCEC
Pate Engineers
The Woodlands Joint Powers Agency
AECOM
Schwartz, Page, & Harding, LLP
LDP Consultants Inc.
Texas Coastal Partners
Lone Star College
US Geological Survey

return to topReturn to top

Contact Us

For information regarding this project, please contact Steven Johnston at the H-GAC by phone at 713-627-3200 or by e-mail at steven.johnston@h-gac.com. Or e-mail the TCEQ’s TMDL Program at tmdl@tceq.texas.gov, and mention the Houston-Galveston bacteria project in the subject line. Reach the TMDL Program by phone at 512-239-6682.

return to topReturn to top

communities working together taking care of our rivers, lakes, and bays