Skip to Content

Search tceq.texas.gov

Questions or Comments: wqap@tceq.texas.gov

Water Quality Individual Permits

Find information about individual permits for discharge of wastewater and stormwater for specific activities. See the types of permits that are available and links to pages about them and their requirements.

Discharging Wastewater or Stormwater Under an Individual Permit

To discharge wastewater and certain types of stormwater into or adjacent to water in the state you must have an individual or a general permit. You may need an individual permit if you don’t qualify for a general permit, for instance, if you engage in specific industrial activities.

HOT NEW Submitting Applications for Individual Permits - Requirements for submitting applications for individual permits online, electronically, or in hard copy. 

Available Individual Permits by Activity

The following webpages may help you determine if you might need an individual permit and find information about how to apply.

Municipal Wastewater - Publicly and privately owned wastewater treatment systems.

Industrial Wastewater - Industrial or commercial facilities that discharge wastewater into water in the state. 

Oil and Gas - Wastewater discharges into water in the state resulting from crude oil or natural gas exploration, development, or production.

Stormwater - Water quality permitting for stormwater runoff from construction sites, industrial facilities, and publicly owned and operated storm sewers.

Agricultural Operations – Concentrated animal feeding operations also known as CAFOs.

Sewage Sludge and Biosolids - Beneficial use and disposal of biosolids or sewage sludge, water treatment plant residuals, and domestic septage.

Summary of What the Individual Permit Entails

An individual permit reflects the site-specific conditions of a single permit holder. An individual permit may include some requirements that are either specific to that site or are more stringent than a general permit authorizing the same activity. See individual permit requirements based on the type of activity in pages listed above.

Public participation: For this permit, two public notices are necessary – the first when an application is administratively complete and the second after the application is technically complete and a draft permit has been prepared.

Review process: Applicants submit a detailed, complex application to TCEQ. The review includes an extensive technical evaluation and processing.

Contact Us

Phone: 512-239-4671
Email: wqap@tceq.texas.gov