requir.txt
requir.txt
— 1 KB
File contents
Texas Natural Resource Conservation Commission
Austin Texas
Memorandum
To: Permit Division Directors/Permit Engineers
From: Lawrence E. Pewitt, P. E., Director, Permits Program
Date: August 21, 1991
Subject: BACT or NSPS Requirements
In some cases, either BACT requirements or NSPS requirements
will result in a different opacity limit for the various
emission points related to the facilities proposed for
construction.
In these cases, please be specific as to the opacity limit for
each emission point and not rely on a reference to a NSPS
limit or a general opacity limit.
This should be of assistance to our investigators in
determining compliance with opacity limits for each emission
point.
