111. Navasota River: Recreational Use
Downloads folder for 111. Navasota River: Recreational Use
A scientific analysis and report to support development of total maximum daily loads to reduce indicator bacteria in the Navasota River watershed.
A document detailing the TCEQ's response to public comments received on a total maximum daily load project for indicator bacteria in the Navasota River below Lake Limestone.
A scientific report detailing the development of two total maximum daily loads to reduce indicator bacteria in the Navasota River below Lake Limestone. These TMDLs are used to determine allowable loadings in new or amended permits for discharges of bacteria in wastewater or stormwater into the watershed.
A document detailing the TCEQ's response to public comments received on an implementation plan for a total maximum daily load project for indicator bacteria in the Navasota River below Lake Limestone.
A plan to implement two total maximum daily loads for indicator bacteria in the Navasota River below Lake Limestone. This plan describes the necessary actions to improve water quality, the schedule for implementation activities, and measurable outcomes for assessing progress.
A document describing the one-year status of an implementation plan for total maximum daily loads for bacteria in the Navasota River Below Lake Limestone.
A project overview describing the Navasota River below Lake Limestone watershed and the steps taken to reduce bacteria in the waterbody through the implementation of a total maximum daily load project.
A document describing the status of the second year of an implementation plan for total maximum daily loads for bacteria in the Navasota River Below Lake Limestone.
Navasota below Lake Limestone: TMDL Implementation Status - Year Three