Nine Total Maximum Daily Loads for PCBs in Segments 0805, 0806, 0829, AND 0841 of the Trinity River, Final Technical Report
A scientific report detailing the development of nine total maximum daily loads for PCBs in segments of the Trinity River.
A scientific report detailing the development of nine total maximum daily loads for PCBs in segments of the Trinity River.