You are here: Home Permitting Air Permits PermitByRule Subchapter O Air PBR 106.355: Pipeline Metering, Purging, and Maintenance

Air PBR 106.355: Pipeline Metering, Purging, and Maintenance

Pipeline metering, purging, and maintenance facilities that meet the conditions of 30 TAC Sections 106.355 and 106.4 are permitted by rule.

Pipeline metering, purging, and maintenance facilities that meet the specific conditions of Title 30, Texas Administrative Code (30 TAC), Section 106.355, Exit the TCEQ and are located in a facility that meets the general conditions of 30 TAC Section 106.4 Exit the TCEQ are permitted by rule.

For more information, see:

If you have questions about this or any other PBR, contact us:
e-mail: airperm@tceq.texas.gov
phone: 512/239-1250

Document Actions