Underground Injection Control
Downloads folder
This is a Class I injection well technical peer review document to provide guidance on reconciling differences in state and federal corrosion monitoring requirements.
This is a Class I injection well technical peer review document to provide guidance on the sampling and analysis of injected waste fluids.
This is a Class I injection well technical peer review document to provide guidance on the physical location requirements for "wellhead" pressure gauges.
This is a Class I injection well technical peer review document to provide guidance on the timing for shutting in a disposal well in response to an alarm condition.
This is a Class I injection well technical peer review document to provide guidance on annulus monitoring requirements during start-up, shut-down, changes in operation, and reporting momentary anomalies in annulus monitoring data.
This is a Class I injection well technical peer review document to provide guidance on required notification and approval for workovers.
This is a Class I injection well technical peer review document to provide guidance on the flexibility of scheduling of annual mechanical integrity testing and pressure fall-off testing.
This is a Class I injection well technical peer review document to provide guidance for inspectors concerning standardized records requests and review procedures.
This is a Class I injection well technical peer review document to provide guidance on how to reflect changes in permit conditions in the quarterly/monthly injection reporting forms.
This is a Class I injection well technical peer review document to provide guidance on interpretation of the term "types" of fluids injected as found in 30 TAC §305.72(b)(4).
This is a Class I injection well technical peer review document to provide guidance on a quality assurance/quality control (QA/QC) program for primary monitoring systems.
This document summarizes the 20 Points of Light Project, a technical peer review process implemented to develop guidance on a number of problematic regulatory requirements for Class I injection wells.
Technical Guideline II - Hydrologic Testing, for Class III injection well permits.
Technical Guideline III - Fluid Handling, for Class III injection well permits.
Permit Application for Underground Injection Control Class I Injection Wells Technical Report - Supplemental Information for Salt Cavern Disposal Wells and Associated Caverns
Spanish NAPD SB 709 Notice Nonhazardous, requiring newspaper notice in an alternative language
Spanish NAPD SB 709 Notice Hazardous, requiring newspaper notice in an alternative language
Spanish Template of Notice of Receipt and Intent to Obtain a Permit for Class I nonhazardous underground injection control well, requiring newspaper notice in an alternative language