Underground Injection Control

Downloads folder
Technical Peer Review Document No. 10

This is a Class I injection well technical peer review document to provide guidance on reconciling differences in state and federal corrosion monitoring requirements.

Technical Peer Review Document No. 12

This is a Class I injection well technical peer review document to provide guidance on the physical location requirements for "wellhead" pressure gauges.

Technical Peer Review Document No. 14

This is a Class I injection well technical peer review document to provide guidance on the timing for shutting in a disposal well in response to an alarm condition.

Technical Peer Review Document No. 15

This is a Class I injection well technical peer review document to provide guidance on annulus monitoring requirements during start-up, shut-down, changes in operation, and reporting momentary anomalies in annulus monitoring data.

Technical Peer Review Document No. 17

This is a Class I injection well technical peer review document to provide guidance on the flexibility of scheduling of annual mechanical integrity testing and pressure fall-off testing.

Technical Peer Review Document No. 18

This is a Class I injection well technical peer review document to provide guidance for inspectors concerning standardized records requests and review procedures.

Technical Peer Review Document No. 20

This is a Class I injection well technical peer review document to provide guidance on how to reflect changes in permit conditions in the quarterly/monthly injection reporting forms.

Technical Peer Review Document No. 21

This is a Class I injection well technical peer review document to provide guidance on interpretation of the term "types" of fluids injected as found in 30 TAC §305.72(b)(4).

Technical Peer Review Document No. 13

This is a Class I injection well technical peer review document to provide guidance on a quality assurance/quality control (QA/QC) program for primary monitoring systems.

Technical Peer Review 20 Points of Light

This document summarizes the 20 Points of Light Project, a technical peer review process implemented to develop guidance on a number of problematic regulatory requirements for Class I injection wells.

Spanish NORI SB 709 Nonhazardous

Spanish Template of Notice of Receipt and Intent to Obtain a Permit for Class I nonhazardous underground injection control well, requiring newspaper notice in an alternative language