Skip to Content

Underground Injection Control

Downloads folder

Spanish Template of Notice of Receipt and Intent to Obtain a Permit for Class III underground injection control well, requiring newspaper notice in alternative language

Application for a Class V Injection Well Authorization for Disposal of Nonhazardous Brine Generated by a Desalination Operation or Nonhazardous Drinking Water Treatment Residuals

General information for a Class V Injection Well Authorization for Disposal of Nonhazardous Brine Generated by a Desalination Operation or Nonhazardous Drinking Water Treatment Residuals.

Application for Class V Underground Injection Control Wells for an Aquifer Storage and Recovery Project

General information for Class V Underground Injection Control Wells for an Aquifer Storage and Recovery Project.

Assist in interpretation of and compliance with revised Class I injection well construction standards.

Basic Guidelines for Mechanical Integrity Tests and Related Cased Hole Wireline Logging

Guidance and selection criteria for sites where stormwater runoff enters aquifers through surface karst features in carbonate rocks. This includes considerations for regulations, site selection, stormwater quality, pretreatment, and best management practices for enhanced aquifer recharge.