Request for a Modification of a Previously Approved Plan
Forms to complete for a request to modify an approved Edwards Aquifer protection plan.
A request for a modification to a previously approved plan, or modification plan, is required for any modification to a previously approved Edwards Aquifer protection plan.
You should submit a modification plan:
- to deviate from your approved plans in the physical design of a pond, dam, berm, sewage treatment plant, flow diverter, or any other structure designed to reduce water pollution;
- to change the way you intend to operate any of these structures;
- to change the type of regulated activity from what was originally approved;
- to make a change that would significantly affect the ability of the plan to prevent pollution of the Edwards Aquifer;
- to develop land that was to be left undeveloped under your original water pollution abatement plan; and
- to make a physical modification to an approved organized sewage collection system, UST facility, or AST facility.
A modification request must go through the application submission and review process and be approved prior to the commencement of the modification.
The fee is based on the acreage of the entire area included within the legal boundaries of the property described in the application and the type of development (one single-family dwelling; multiple single-family residential or parks; and non-residential). The minimum fee is $650; the maximum fee, $10,000. For additional information on fees, view the Application Fee Form TCEQ-0574 ( PDF, Word), which includes a complete fee schedule.
Do not leave any questions unanswered. If a question does not apply to your site, enter “N/A” in the blank and briefly explain why the question does not apply.
The forms listed below are required regardless of which area you are requesting an exception for.
Application Fee (Check payable to the “Texas Commission on Environmental Quality”)
In addition to the forms listed above, use the applicable forms below to complete your
modification request.
These forms are grouped by Recharge and Transition
Zones or Contributing Zone.
The following forms are required when requesting an exception in the Recharge or Transition Zones of the Edwards Aquifer.
Geologic Assessment
Modification of a Previously Approved Plan
The following forms are required when requesting an exception in the Contributing Zone of the Edwards Aquifer.
Modification of a Previously Approved Contributing Zone Plan
Stormwater Pollution Prevention Plan (if applicable)
Notice of Intent (NOI) for Stormwater Discharges Associated with Construction Activity under TPDES General Permit (TXR150000)
NOI is completed online through ePermits or a paper copy can be requested by calling (512)239-3700.