Brazos River Recreational Use Attainability Analysis, Part 4
RUAAs for Campbells Creek, Mud Creek, Pin Oak Creek, Spring Creek, and Walnut Creek, Brazos River Basin
Project Summary
Status: Completed; awaiting EPA approval
Basin | Brazos River Basin |
---|---|
Segment Names and Numbers | Campbells Creek, 1242I; Mud Creek, 1242K; Pin Oak Creek, 1242L; Spring Creek, 1242M; and Walnut Creek, 1242O |
Counties | Robertson |
Recreational-Survey Report | TCEQ has completed a report of its Recreational Use Attainability Analysis for these water bodies. |
Public Review of Recreational-Survey Report | The comment period for the draft report has concluded. After the comment period on the draft report closed, TCEQ used the comments to make an informed recommendation for the recreational-use category and criteria to include in the Texas Surface Water Quality Standards. |
TCEQ Recommendations | There was a comment period after publishing the recommendations on recreational use. TCEQ recommended the contact recreation use on Campbells Creek, Mud Creek, Pin Oak Creek, Spring Creek, and Walnut Creek be revised to secondary contact recreation 1. These use changes were included in the 2018 Texas Surface Water Quality Standards. The recommendations can be found here: |
Final Outcome | The following water bodies have recreation use changes approved by EPA:
|
Project Report
The RUAA for Campbells Creek, Mud Creek, Pin Oak Creek, Spring Creek, and Walnut Creek is available for download. The report is in PDF. Approximate file size is shown in parentheses.
- Full Report
(10 MB)
- Surveys
(17 MB)
- Photos
(16 MB)
For More Information
Additional information on the project is available at the Texas State Soil and Water Conservation Board’s project website
E-mail us at standards@tceq.texas.gov or see contact information for staff members.