Investigative Checklists for Waste
Criteria used by TCEQ investigators during site visits. Made available to the public as a courtesy so those investigated (routinely or due to a complaint) can know what the agency will look for.
Lists are in PDF files.
- Dry Cleaner CEI
- IHW Boiler and Industrial Furnace (BIF)
- IHW Boiler and Industrial Furnace (BIF) Pre-Investigation
- IHW Boiler and Industrial Furnace (BIF) Addendum
- IHW CEI General Facility
- IHW CEI Landfill
- IHW CEI Subpart AA
- IHW CEI Subpart BB
- IHW CEI Subpart CC
- IHW Complaint
- IHW Container Storage Area
- IHW Existing Tanks
- IHW Focused Investigation for CESQG
- IHW Focused Investigation for Generation and Classification
- IHW Focused Investigation for LQG Container Storage Area
- IHW Focused Investigation for LQG Tanks
- IHW Focused Investigation for SQG Container Storage Area
- IHW Focused Investigation for SQG Tanks
- IHW Focused Investigation for Transfer / Transporter
- IHW Focused Investigation for Class V UIC
- IHW Hydrogeologic Checklist
- IHW Importer of Record
-
IHW Incinerator Checklist
- IHW New Tanks
- IHW Permit Compliance
- IHW Permitted Container Storage Area
- IHW Permitted Facility General Standards
- IHW Pre-Investigation
- IHW RCRA Interim Status CME Groundwater Checklist 2
- IHW RCRA Interim Status Facility CME Checklist 6 Section A
- IHW RCRA Interim Status Facility CME Checklist 6 Section B
- IHW RCRA Interim Status Facility CME Checklist 8
- IHW RCRA Interim Status Facility CME Groundwater Checklist 3
- IHW RCRA Permitted Facility CME Checklist 5
- IHW RCRA Permitted Facility CME Checklist 7 Section A
- IHW RCRA Permitted Facility CME Checklist 7 Section B
- IHW RCRA Permitted Facility CME Checklist 9
- IHW RCRA Permitted Facility CME Groundwater Checklist 4
- IHW Sample Analyses Results
- IHW Small Quantity Tanks
- IHW UIC Compliance
- IHW Universal Waste Destination Facility CEI
- IHW Universal Waste Large Quantity Handler CEI
- IHW Universal Waste Small Quantity Handler CEI
- IHW Universal Waste Transporter CEI
- IHW Waste Transporter
- MSW O and M
- MSW Asbestos
- MSW Closure
- MSW CME Checklist A Introduction
- MSW CME Checklist B Detection Monitoring
- MSW CME Checklist C Assessment Monitoring
- MSW CME Checklist D Corrective Action
- MSW CME Checklist E Groundwater Monitoring
- MSW Complaint Investigation
- MSW Compost—Facilities Which Require A Permit
- MSW Compost Checklist B—Facilities Which Require a Registration
- MSW Compost FAC—Permit and Registration Not Required
- MSW Focused Investigation for Landfill Gas
- MSW Focused Investigation for Leachate at Permitted Facility
- MSW Focused Investigation for Waste Screening at Permitted Facility
- MSW Groundwater O and M Part 1
- MSW Groundwater O and M Part 2
- MSW Groundwater
- MSW Landfill Gas
- MSW Medical-Waste Collection
- MSW Medical-Waste Generator
- MSW Medical Waste Mobil Treatment
- MSW Medical Waste, On-Site Treatment
- MSW Medical-Waste Transporter
- MSW Record-Keeping Requirements
- MSW Recycling
- MSW Scrap Tire Facility
- MSW Scrap Tire Generator
- MSW Scrap Tire Storage Site
- MSW Scrap Tire Transporter
- MSW Site Operating Plan
- MSW Tire Transportation Facility
- MSW Tires Land Reclamation Project Using Tires (LRPUT)
- MSW Type 1–4 Landfill General Summary
- MSW Type 1–4 Landfill
- MSW Type 5 Processor—Part 1
- MSW Type 5 Processor—Part 2
- MSW Unauthorized Site
- MSW Used Oil Closure
- MSW Used Oil Filter Handler
- MSW Used Oil Handler Burners of Off-Spec Oil
- MSW Used Oil Handler General/Prohibition
- MSW Used Oil Handler Generators
- MSW Used-Oil Handler Marketers
- MSW Used Oil Handler Processor/Refiners
- MSW Used Oil Handler Transporter/Transfer
- OPRR - MSW Alternative Daily Cover, Landfill Gas and Groundwater Reports
- LPST Case Status Investigation
- PST Abandonment, Removal, and Change-In-Service Investigation Report
- PST Energy Act Focused Investigation
- PST Focused Investigation—TXLED
- PST Full CEI #1 General Information
- PST Full CEI #2 Registration and Self Certification
- PST Full CEI #3 Spill and Overfill Prevention
- PST Full CEI #4 Corrosion Protection
- PST Full CEI #5 Financial Assurance
- PST Full CEI #6 Piping Release Detection
- PST Full CEI #7A Automatic Tank Gauging and Investigation Control
- PST Full CEI #7B SIR
- PST Full CEI #7C Interstitial Monitoring
- PST Full CEI #7D Vapor Monitoring
- PST Full CEI #7E Groundwater Monitoring
- PST Full CEI #7F Manual Tank Gauging
- PST Full CEI #7G Monthly Tank Gauging
- PST Full CEI #7H ATG for Emergency Generator Tanks
- PST Full CEI #7I Secondary Containment Barrier
- PST Installation, Upgrade, and Repair Investigation Report
- PST Modified Compliance Evaluation Investigation
- PST Out of Service (OOFS) Checklist
- PST Stage I Investigation
- Stage I PST Energy Act Focused Investigation