Types of Authorization for Fluid Catalytic Cracking Units

Describes which authorizations may be applicable to Fluid Catalytic Cracking Units.

The following list of permit authorizations is arranged in order of the time and effort required to obtain authorization.

  • Permits by Rule (PBRs) for Fluid Catalytic Cracking Units. These links will take you to the specific PBR that may apply to your facility. Review the general information for qualifying and applying for a PBR. Contact air permitting staff regarding partial permitting policies.
    • Title 30, Texas Administrative Code, Section 106.183 - Boilers, Heaters, and Other Combustion Devices
    • Section 106.472 - Organic and Inorganic Liquid Loading and Unloading
    • Section 106.473 - Organic Liquid Loading and Unloading
  • Construction Permit - If you cannot qualify for another type of permit authorization, you must apply for a case-by-case construction permit under 30 TAC Chapter 116.
  • Flexible Permit - 30 TAC 116, Subchapter G