Air PBR 106.283: Grain Handling, Storage, and Drying
Noncommercial facilities for the handling, storage, and drying of grain are permitted by rule if they meet the conditions stated in 30 TAC Sections 106.4 and 106.283. In some cases, this PBR must be claimed before construction begins. Links to relevant forms and rules.
Grain handling, storage, and drying facilities that meet the specific conditions of Title 30, Texas Administrative Code (30 TAC), Section 106.283 , and are located in a facility that meets the general conditions of 30 TAC Section 106.4 are permitted by rule.
- Complete our PBR Applicability Checklist, TCEQ Form - 10149, to find out whether your facility meets the general conditions for a PBR,
–and– - to find out whether it meets the specific conditions for this PBR, complete our PBR 106.283 Checklist, TCEQ Form - 20069
- Claiming a Permit by Rule (PBR; general instructions)
- Fee Requirements for Permits by Rule
Recordkeeping
Under 30 TAC Section 106.8 , your records must identify the rules under which your facility is operating and demonstrate compliance for a rolling 12-month period. Be sure you keep at least these records:
- a copy of Section 106.4
- a copy of Section 106.283
- records documenting compliance with the above rules
These records must be kept on site and readily available on request for inspection by the TCEQ or any air pollution control program that has jurisdiction. If you have questions about the type of records you should keep, contact the Air Program in the TCEQ regional office that serves your county.
Questions? We Can Help
If you have questions, please contact us.