Cypress Creek Basin Recreational Use Attainability Analysis
RUAAs for Big Cypress Creek Below Lake Bob Sandlin, Tankersley Creek, and Hart Creek, Cypress Creek Basin.
On this page:
Project Summary
Status: Completed; awaiting EPA approval
Basin | Cypress Creek Basin |
---|---|
Segment Names and Numbers | Big Cypress Creek Below Lake Bob Sandlin, 0404; Tankersley Creek, 0404B; Hart Creek, 0404C |
Counties | Camp, Morris, and Titus |
Recreational Survey Report | TCEQ has completed a report of its Recreational Use Attainability Analysis for these water bodies. |
Public Review of Recreational-Survey Report | The comment period for the draft report has concluded. After the comment period on the draft report closed, TCEQ used the comments to make an informed recommendation for the recreational-use category and criteria to include in the Texas Surface Water Quality Standards. |
TCEQ Recommendations | There was a comment period after publishing the recommendations on recreational use. TCEQ recommended the contact recreational use on Big Cypress Creek Below Lake Bob Sandlin, Tankersley Creek, and Hart Creek should be revised to secondary contact recreation 1. This use was included in the 2018 Texas Surface Water Quality Standards. The recommendations can be found here: |
Final Outcome |
The following recreation use changes are awaiting EPA approval:
|
Project Report
The RUAA for Big Cypress Creek Below Lake Bob Sandlin, Tankersley Creek, and Hart Creek is available for download. The report is in PDF. Approximate file size is shown in parentheses.
- Full Report
(36 MB)
- Photos
(5 MB)
For More Information
E-mail us at standards@tceq.texas.gov or see contact information for staff members.