Viewing and Understanding a Pending Application.
Resolving an Error Message or Difficulties Opening a Document.
Data Updated: 5/24/2025
A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z
Applicant Name | Area Name | Permit Number | Received Date | Application Link |
---|---|---|---|---|
A | Back to top | |||
Abilene Dc 1, LLC | Longhorn Data Center | 4721 | 01/23/2025 | Administrative Complete Application |
Air Liquide Large Industries U.S. LP | Air Liquide Bayou Cogeneration Plant | 1735 | 09/18/2024 | Administrative Complete Application |
Air Liquide Large Industries U.S. LP | Freeport Hyco Plant | 2391 | 02/19/2025 | Administrative Complete Application |
Air Products LLC | La Porte Texas Facility | 1249 | 03/19/2025 | Administrative Complete Application |
Alamo Mission LLC | Alamo Mission Data Center | 4709 | 12/04/2024 | Administrative Complete Application |
Ameresco Dallas LLC | Ameresco Biogas Energy Facility | 3401 | 03/24/2023 | Technically Complete Application |
AMERICAN ACRYL LP | American Acryl Bayport Complex | 2655 | 03/05/2025 | Administrative Complete Application |
American Polymer Company | American Polymer Company | 4701 | 10/28/2024 | Technically Complete Application |
Apache Global Painting, Inc. | North Lake Houston Facility | 4750 | 05/01/2025 | Administrative Complete Application |
Aquatics, Inc. | Aquatic | 1063 | 10/16/2024 | Technically Complete Application |
Arkema Inc. | Beaumont Facility Chemical Manufacturing | 1636 | 03/13/2025 | Administrative Complete Application |
ARLANXEO USA LLC | Butadiene Rubber Unit | 2281 | 01/15/2025 | Administrative Complete Application |
ARLANXEO USA LLC | Libr Flex Unit | 2282 | 06/25/2024 | Administrative Complete Application |
Ascend Performance Materials Inc. | Distribution | 2323 | 04/25/2025 | Administrative Complete Application |
Ascend Performance Materials Texas Inc. | An - 2/3 | 2321 | 02/12/2025 | Administrative Complete Application |
Ascend Performance Materials Texas Inc. | An - 2/3 | 2321 | 05/23/2024 | Technically Complete Application |
Ascend Performance Materials Texas Inc. | Dsida | 2318 | 03/17/2025 | Administrative Complete Application |
Ascend Performance Materials Texas Inc. | Formalin Unit | 2322 | 10/17/2024 | Administrative Complete Application |
Atmos Energy Corporation | Tri-Cities Storage Compressor Station | 2458 | 12/20/2024 | Administrative Complete Application |
Atmos Energy Corporation | Bethel Storage Compressor Station | 3867 | 12/20/2024 | Administrative Complete Application |
B | Back to top | |||
BASF Corporation | Pasadena Plant | 1331 | 09/27/2024 | Administrative Complete Application |
BASF Corporation | Basf Freeport - Polyamide Manufacturing Plant | 1536 | 07/11/2024 | Technically Complete Application |
BASF Corporation | Oxo/Syngas Alcohols Complex | 1928 | 04/11/2024 | Technically Complete Application |
BASF Corporation | 1,6 Hexanediols And Neopentyl Glycol Complex | 2158 | 08/05/2024 | Technically Complete Application |
BASF TOTALEnergies Petrochemicals LLC | Ethylene / Propylene Cracker And Cogeneration | 2551 | 01/18/2024 | Technically Complete Application |
Bayport Polymers LLC | Ethane Cracker | 4161 | 01/30/2025 | Administrative Complete Application |
Bell Textron Inc. | Bell Textron Plant 1 | 1631 | 09/23/2024 | Technically Complete Application |
Bher Power Resources, Inc. | C R Wing Cogeneration Plant | 91 | 12/12/2024 | Administrative Complete Application |
BIMBO BAKERIES USA, INC. | Earthgrains Baking | 4545 | 11/02/2023 | Technically Complete Application |
Blaine Larsen Farms, Inc. | Larsen Farms Power Generating Facility Plant No. 1 | 3896 | 08/01/2024 | Administrative Complete Application |
Blue Cube Operations LLC | Gco Freeport Operations | 1388 | 03/19/2024 | Technically Complete Application |
Blue Cube Operations LLC | Epoxy Products & Fmto | 2207 | 12/26/2024 | Administrative Complete Application |
Blue Cube Operations LLC | Epoxy Products & Fmto | 2207 | 03/22/2024 | Technically Complete Application |
Blue Cube Operations LLC | Chlor-Alkali | 2202 | 04/12/2024 | Technically Complete Application |
Blue Cube Operations LLC | Epoxy Intermediates | 2208 | 09/06/2024 | Administrative Complete Application |
Bpx Midstream LLC | Crossroads Cdp | 4753 | 05/08/2025 | Administrative Complete Application |
Brazos Midstream Operating, LLC | Comanche Plant | 4119 | 10/14/2024 | Administrative Complete Application |
Bridgestone Bandag, LLC | Bridgestone Bandag Llc | 1074 | 04/28/2025 | Administrative Complete Application |
Buckeye Texas Processing LLC | Corpus Christi Refining | 3869 | 02/03/2025 | Administrative Complete Application |
C | Back to top | |||
Carbon Silica Partners, L.P. | Diamond Fiberglass Fabricators | 2714 | 04/16/2025 | Administrative Complete Application |
Channel Energy Center, LLC | Channel Energy Center | 2084 | 03/19/2024 | Technically Complete Application |
Chevron Phillips Chemical Company, LP | Polyethylene Unit (Peu 1799) | 2370 | 11/14/2024 | Administrative Complete Application |
Chevron Phillips Chemical Company, LP | Polyethylene Unit 1792, 1796 And 1799 | 2115 | 03/10/2025 | Administrative Complete Application |
Chevron Phillips Chemical Company, LP | Sweeny Complex , Olefins And Ngl Assets | 2151 | 03/02/2023 | Technically Complete Application |
Chevron Phillips Chemical Company, LP | Polyethylene Units 40 41 And 1-Hexene Unit 81 | 3961 | 10/19/2023 | Technically Complete Application |
Chevron Phillips Chemical Company, LP | Olefin Units | 2114 | 12/17/2024 | Administrative Complete Application |
Chevron Phillips Chemical Company, LP | Borger Plant | 2164 | 04/30/2024 | Technically Complete Application |
Citgo Refining and Chemicals Company L.P. | Corpus Christi Refinery East Plant And Terminal | 1423 | 05/30/2024 | Technically Complete Application |
City of Austin | Decker Creek Power Plant | 22 | 12/09/2024 | Administrative Complete Application |
City of Garland Power & Light | Spencer Generating Station | 84 | 01/17/2025 | Administrative Complete Application |
City Public Service Board | Calaveras Lake Plant | 8 | 03/17/2025 | Administrative Complete Application |
Coleto Creek Power, LLC | Coleto Creek Power Station | 25 | 03/27/2025 | Administrative Complete Application |
Colonial Pipeline Company | Port Arthur Products Station | 2733 | 01/07/2025 | Administrative Complete Application |
Colonial Pipeline Company | Port Arthur Products Station | 2733 | 08/27/2024 | Technically Complete Application |
Colt G & P (North Texas) L.P. | Weatherford Plant | 2986 | 12/19/2024 | Administrative Complete Application |
Compass Datacenters DFW III, LLC | Red Oak Datacenter | 4679 | 08/29/2024 | Administrative Complete Application |
Conduit Tollco, LLC | Sunbridge Facility | 4463 | 05/04/2025 | Administrative Complete Application |
Corpus Christi Liquefaction, LLC | Corpus Christi Liquefaction | 3580 | 04/23/2025 | Administrative Complete Application |
Corpus Christi Liquefaction, LLC | Corpus Christi Liquefaction Stage 3 | 4592 | 11/20/2023 | Technically Complete Application |
Corteva Agriscience LLC | Corteva Freeport Operations | 2206 | 07/11/2024 | Technically Complete Application |
COTTONWOOD ENERGY COMPANY LP | Cottonwood Energy Project | 2338 | 08/30/2024 | Technically Complete Application |
Covestro LLC | Bc | 2103 | 05/12/2025 | Administrative Complete Application |
Covestro LLC | Ecd And Utilities | 1390 | 11/06/2024 | Administrative Complete Application |
Covestro LLC | Polyurethanes I - Mdi | 2101 | 05/02/2025 | Administrative Complete Application |
Covestro LLC | Coatings Adhesives And Specialties | 2104 | 04/11/2025 | Administrative Complete Application |
Covestro LLC | Sl Area | 2529 | 09/13/2024 | Technically Complete Application |
Covestro LLC | Aniline Unit | 3674 | 05/02/2025 | Administrative Complete Application |
Cowtown Gas Processing Partners L.P. | West Johnson County Compressor Station | 4552 | 01/03/2025 | Administrative Complete Application |
D | Back to top | |||
DCP Operating Company, LP | Ozona Gas Plant | 2542 | 01/21/2025 | Administrative Complete Application |
DCP Operating Company, LP | Sonora Gas Plant | 125 | 04/23/2025 | Administrative Complete Application |
DCP Operating Company, LP | Sherhan Gas Plant | 2569 | 10/28/2024 | Administrative Complete Application |
DCP Operating Company, LP | Goldsmith Gas Plant | 2585 | 06/11/2024 | Technically Complete Application |
DCP Operating Company, LP | West Beaumont Gas Plant | 2802 | 06/10/2024 | Technically Complete Application |
DCP Operating Company, LP | Giddings Gas Plant | 4626 | 03/04/2024 | Technically Complete Application |
Deer Park Refining Limited Partnership | Deer Park Rail Terminal | 4669 | 08/08/2024 | Technically Complete Application |
Delaware Basin Midstream, LLC | Ramsey Gas Plant | 3901 | 06/11/2024 | Technically Complete Application |
Dow Hydrocarbons and Resources LLC | General Plant Facilities, Energy Systems, And Distribution Systems | 2035 | 05/10/2024 | Technically Complete Application |
Dow Hydrocarbons and Resources LLC | Stratton Ridge | 4673 | 08/14/2024 | Technically Complete Application |
E | Back to top | |||
Eastman Chemical Company | C7 - Materials Handling | 1436 | 02/27/2025 | Administrative Complete Application |
Eastman Chemical Company | C3 - Texanol | 1977 | 10/02/2024 | Administrative Complete Application |
Eastman Chemical Company | C4-Acetaldehyde | 1971 | 05/17/2024 | Technically Complete Application |
Eastman Chemical Company | C5 - Ethylene Glycol | 1974 | 09/27/2024 | Administrative Complete Application |
Eastman Chemical Company | U2 - Environmental Services | 1981 | 06/03/2024 | Technically Complete Application |
El Paso Natural Gas Company, L.L.C. | Keystone Compressor Station | 3177 | 08/05/2024 | Technically Complete Application |
El Paso Natural Gas Company, L.L.C. | Guadalupe Compressor Station | 3167 | 08/05/2024 | Technically Complete Application |
El Paso Natural Gas Company, L.L.C. | Epng Waha Cs | 4183 | 05/08/2025 | Administrative Complete Application |
El Paso Natural Gas Company, L.L.C. | Cornudas Compressor Station | 3166 | 03/28/2025 | Administrative Complete Application |
Ellwood Texas Forge, L.P. | Iron And Steel Forgings | 1760 | 03/19/2025 | Administrative Complete Application |
ENBRIDGE INGLESIDE OIL TERMINAL, LLC | Enbridge Ingleside Oil Terminal | 3906 | 10/24/2024 | Administrative Complete Application |
EnLink Midstream Services, LLC | Lateral B-117 Compressor Station | 4141 | 02/18/2025 | Administrative Complete Application |
EnLink North Texas Gathering, LP | Adeline Compressor Station | 4412 | 12/11/2024 | Technically Complete Application |
Enterprise Hydrocarbons L.P. | Thompsonville Gas Plant | 3510 | 12/12/2023 | Technically Complete Application |
Enterprise Hydrocarbons L.P. | Armstrong Gas Plant | 3184 | 11/19/2024 | Technically Complete Application |
Enterprise Hydrocarbons L.P. | Shilling Gas Treating Plant | 3229 | 10/21/2024 | Administrative Complete Application |
Enterprise Midland Basin Midstream LLC | Newberry Gas Plant | 3959 | 04/17/2024 | Technically Complete Application |
Enterprise Midland Basin Midstream LLC | Taylor Gas Plant | 4145 | 07/30/2024 | Technically Complete Application |
Enterprise Midland Basin Midstream LLC | Leonidas Gas Plant | 4630 | 03/26/2024 | Technically Complete Application |
Enterprise Products Operating LLC | Houston Terminal | 1043 | 09/19/2024 | Administrative Complete Application |
Enterprise Products Operating LLC | Enterprise Pasadena Plant | 1429 | 05/20/2024 | Technically Complete Application |
Enterprise Products Operating LLC | Mont Belvieu Complex | 1641 | 09/11/2024 | Administrative Complete Application |
Enterprise Products Operating LLC | Grey Ranch Compressor Station | 3140 | 05/02/2024 | Technically Complete Application |
Enterprise Products Operating LLC | Eagleford Fractionation Units | 3557 | 08/06/2024 | Technically Complete Application |
Enterprise Products Operating LLC | Area 51 Cgp Facility | 3583 | 12/05/2023 | Technically Complete Application |
Enterprise Refined Products Company LLC | Neches River Terminal | 4023 | 08/15/2024 | Administrative Complete Application |
Enterprise Refined Products Company LLC | Baytown Terminal | 4527 | 10/31/2023 | Technically Complete Application |
Envases Commerce, LLC | Envases Commerce Waco Can Plant | 4738 | 04/02/2025 | Administrative Complete Application |
Equistar Chemicals, LP | Bayport Plant Plastics Materials And Resin Manufacturing | 1419 | 09/04/2024 | Administrative Complete Application |
Equistar Chemicals, LP | La Porte Complex | 2223 | 02/03/2025 | Administrative Complete Application |
ET Gathering & Processing LLC | Sunray Compressor Station | 3073 | 04/24/2025 | Administrative Complete Application |
ET Gathering & Processing LLC | Mi Vida Treater Plant | 3186 | 08/11/2024 | Technically Complete Application |
ET Gathering & Processing LLC | Grey Wolf Gas Plant | 4447 | 09/11/2024 | Administrative Complete Application |
ET Gathering & Processing LLC | Hebbronville Compressor Station | 598 | 08/05/2024 | Technically Complete Application |
ET Gathering & Processing LLC | La Grange Gas Processing Plant | 3098 | 04/29/2025 | Administrative Complete Application |
ET Gathering & Processing LLC | Waha Gas Plant | 2546 | 07/22/2024 | Technically Complete Application |
ET Gathering & Processing LLC | Gomez Gas Treating Facility | 3146 | 10/21/2024 | Administrative Complete Application |
ET Gathering & Processing LLC | Coyanosa Gas Plant | 3187 | 10/15/2024 | Technically Complete Application |
ET Gathering & Processing LLC | Panther Gas Plant | 4448 | 03/31/2023 | Technically Complete Application |
ET Gathering & Processing LLC | Tippett Gas Plant | 3190 | 07/22/2024 | Technically Complete Application |
Et Genco LLC | Wt-2 Ps Power Generation | 4708 | 12/03/2024 | Administrative Complete Application |
Etc Gas Gathering Company, Llc | Freda Compressor Station | 4740 | 04/07/2025 | Administrative Complete Application |
ETC North Permian Midstream LLC | Crow Compressor Station | 4171 | 08/19/2024 | Administrative Complete Application |
ETC North Permian Midstream LLC | Lenorah Gas Plant | 4734 | 03/20/2025 | Administrative Complete Application |
ETC South Permian Midstream LLC | Benedum Gas Plant | 946 | 02/19/2025 | Administrative Complete Application |
ETC South Permian Midstream LLC | E-Line Booster Station | 4674 | 08/14/2024 | Administrative Complete Application |
ETC Texas Pipeline, Ltd. | Tilden Gas Plant | 3093 | 10/14/2024 | Administrative Complete Application |
Exxon Mobil Corporation | Baytown Refinery | 1229 | 10/29/2024 | Administrative Complete Application |
Exxon Mobil Corporation | Baytown Refinery | 1229 | 02/07/2024 | Technically Complete Application |
Exxon Mobil Corporation | Baytown Chemical Plant | 2269 | 10/30/2024 | Technically Complete Application |
Exxon Mobil Corporation | Baytown Olefins Plant | 1553 | 09/23/2024 | Administrative Complete Application |
Exxon Mobil Corporation | Baytown Chemical Plant | 2269 | 01/30/2025 | Administrative Complete Application |
Exxon Mobil Corporation | Mont Belvieu Plastics Plant | 2276 | 09/27/2024 | Administrative Complete Application |
ExxonMobil Oil Corporation | Beaumont Refinery | 2000 | 08/15/2024 | Administrative Complete Application |
ExxonMobil Pipeline Company LLC | Exxonmobil South Houston Terminal | 3021 | 09/04/2024 | Technically Complete Application |
ExxonMobil Pipeline Company LLC | Webster Station | 3038 | 05/24/2024 | Technically Complete Application |
ExxonMobil Pipeline Company LLC | Exxonmobil Irving Terminal | 2757 | 12/19/2024 | Administrative Complete Application |
ExxonMobil Pipeline Company LLC | Exxonmobil North Houston Terminal | 3022 | 01/24/2025 | Administrative Complete Application |
F | Back to top | |||
Fiber Glass Systems, L.P. | Andrews Plant | 4376 | 03/14/2025 | Administrative Complete Application |
Flint Hills Resources Corpus Christi LLC | Corpus Christi East Refinery | 1445 | 09/03/2024 | Technically Complete Application |
Flint Hills Resources Corpus Christi LLC | Fort Worth Terminal | 4244 | 10/08/2024 | Technically Complete Application |
Formosa Plastics Corporation, Texas | Polypropylene Plant | 1956 | 05/14/2024 | Technically Complete Application |
Formosa Plastics Corporation, Texas | Specialty Pvc Plant | 3409 | 04/24/2024 | Technically Complete Application |
Formosa Plastics Corporation, Texas | Energy/Steam Generating Facility | 3421 | 06/21/2024 | Administrative Complete Application |
Formosa Plastics Corporation, Texas | Ethylene Glycol Plant | 1484 | 02/28/2024 | Technically Complete Application |
Formosa Plastics Corporation, Texas | Olefins 3 And Propane Dehydrogenation (Pdh) Plant | 4165 | 02/03/2025 | Administrative Complete Application |
Formosa Plastics Corporation, Texas | Pe3 Plant | 4166 | 01/06/2025 | Administrative Complete Application |
Formosa Plastics Corporation, Texas | Pe3 Plant | 4166 | 05/02/2024 | Technically Complete Application |
Freeport LNG Development, L.P. | Freeport Lng Regas Facility And Liquefaction Plant | 2878 | 01/22/2024 | Technically Complete Application |
Frito-Lay, Inc. | Frito-Lay Rosenberg Facility | 1104 | 01/08/2025 | Administrative Complete Application |
Frontera Generation Limited Partnership | Frontera Energy Center | 1888 | 04/17/2024 | Technically Complete Application |
G | Back to top | |||
GATX Corporation | Hearne Maintenance Facility | 1678 | 09/13/2024 | Administrative Complete Application |
General Motors LLC | General Motors Arlington Assembly Plant | 1151 | 01/29/2025 | Administrative Complete Application |
General Shale Brick, Inc. | Mineral Wells Facility | 1692 | 02/06/2025 | Administrative Complete Application |
Gerdau Ameristeel US Inc. | Gerdau Midlothian Plant | 2110 | 05/13/2024 | Technically Complete Application |
Golden Spread Electric Cooperative, Inc. | Mustang Station Units 1 And 2 | 1777 | 07/20/2024 | Technically Complete Application |
Graphic Packaging International, LLC | Texarkana Mill | 1378 | 03/21/2025 | Administrative Complete Application |
Graphic Packaging International, LLC | Graphic Packaging International Waco Mill | 4687 | 09/18/2024 | Administrative Complete Application |
GS II, Inc. | Certainteed Roofing | 4706 | 11/20/2024 | Administrative Complete Application |
Guadalupe Power Partners, LP | Guadalupe Generating Station | 2071 | 06/06/2024 | Technically Complete Application |
Gulf Coast Growth Ventures LLC | Olefins, Derivative And Utilities | 4169 | 10/24/2024 | Technically Complete Application |
Gulf South Pipeline Company, LLC | Goodrich Compressor Station | 3066 | 11/27/2024 | Administrative Complete Application |
H | Back to top | |||
Hanwha Advanced Materials America, LLC | Hanwha Advanced Materials America | 4726 | 02/07/2025 | Administrative Complete Application |
Heritage Thermal of Texas, LLC | Sabine Regional Incinerator | 1896 | 03/13/2025 | Administrative Complete Application |
Hobas Pipe USA, Inc. | Houston Plant | 2766 | 10/03/2024 | Administrative Complete Application |
Honeywell International Inc. | Polyethylene Wax Unit | 1533 | 09/23/2024 | Technically Complete Application |
Houston Refining LP | Houston Refining | 1372 | 07/29/2022 | Technically Complete Application |
I | Back to top | |||
IACX Rock Creek LLC | Rock Creek Gas Plant | 2449 | 09/26/2024 | Administrative Complete Application |
Indorama Ventures Oxides LLC | E4 & E7 Units | 2287 | 01/08/2025 | Administrative Complete Application |
Indorama Ventures Oxides LLC | Po/Mtbe Plant | 3056 | 03/04/2024 | Technically Complete Application |
INEOS Americas LLC | Bayport Eo Plant | 1373 | 12/22/2023 | Technically Complete Application |
INEOS Chocolate Bayou Pipeline LLC | Stratton Ridge Pumping Station | 3302 | 09/10/2024 | Administrative Complete Application |
INV Nylon Chemicals Americas, LLC | Acids And Utilities | 1415 | 09/26/2024 | Technically Complete Application |
INV Nylon Chemicals Americas, LLC | Adn Hmd Powerhouse | 1897 | 11/20/2023 | Technically Complete Application |
INV Polypropylene, LLC | Invista Longview | 4731 | 02/28/2025 | Administrative Complete Application |
J | Back to top | |||
Jack A. Fusco Energy Center, LLC | Jack A Fusco Energy Center | 2334 | 08/19/2024 | Administrative Complete Application |
JACK COUNTY POWER LLC | Jack County Generation Facility | 2169 | 07/29/2024 | Technically Complete Application |
Johns Manville | Cleburne Plant | 1677 | 09/27/2024 | Administrative Complete Application |
K | Back to top | |||
Ketjen Limited Liability Company | Bayport Plant | 1559 | 07/17/2024 | Technically Complete Application |
KIEWIT OFFSHORE SERVICES LTD | Ingleside Offshore Platform Fabrication Facilities | 3343 | 11/18/2024 | Administrative Complete Application |
Kinder Morgan Crude & Condensate LLC | Galena Park Splitter Facility | 3764 | 06/25/2024 | Technically Complete Application |
Knauf Insulation, Inc. | Mcgregor Facility | 4686 | 09/17/2024 | Administrative Complete Application |
Kohler Co. | Kohler Plastics Plant | 2711 | 11/12/2024 | Technically Complete Application |
Kudu Midstream LLC | Bland Lake Amine Plant | 4658 | 07/11/2024 | Administrative Complete Application |
Kuraray America, Inc. | Vinyl Acetate / Polyvinyl Alcohol Manufacturing Unit | 1911 | 05/12/2025 | Administrative Complete Application |
Kuraray America, Inc. | Eval Business Unit | 1561 | 05/02/2025 | Administrative Complete Application |
Kuraray America, Inc. | Pvoh Plant | 3759 | 08/04/2023 | Technically Complete Application |
L | Back to top | |||
LaPorte Power, LLC | Peaking Power Plant | 4328 | 02/20/2025 | Administrative Complete Application |
LaPorte Rail and Terminal, LLC | Environmental Control Area | 1907 | 06/26/2024 | Technically Complete Application |
Lhoist North America of Texas, LLC | Clifton Lime Plant | 1108 | 12/20/2024 | Administrative Complete Application |
Lone Star Industries, Inc. | Maryneal Cement Plant | 1119 | 05/09/2023 | Technically Complete Application |
Louisiana-Pacific Corporation | Carthage Oriented Strandboard (Osb) Mill | 1200 | 09/26/2024 | Administrative Complete Application |
Louisiana-Pacific Corporation | Carthage Oriented Strandboard (Osb) Mill | 1200 | 04/14/2025 | Administrative Complete Application |
Lower Colorado River Authority | Winchester Power Park | 3026 | 03/19/2025 | Administrative Complete Application |
Lower Colorado River Authority | Thomas C Ferguson Power Plant | 19 | 02/17/2025 | Administrative Complete Application |
Lower Neches Valley Authority | Neches 1St Pumping Station | 1402 | 01/24/2025 | Administrative Complete Application |
Luminant Generation Company LLC | Lamar Power Plant | 2065 | 02/16/2024 | Technically Complete Application |
Luminant Generation Company LLC | Trinidad Steam Electric Station | 57 | 02/04/2025 | Administrative Complete Application |
LyondellBasell Acetyls, LLC | La Porte Complex | 1375 | 01/15/2024 | Technically Complete Application |
LyondellBasell Acetyls, LLC | Lyondellbasell Syngas | 2290 | 02/17/2025 | Administrative Complete Application |
M | Back to top | |||
Magellan Pipeline Company, L.P. | Frost Station | 3698 | 09/19/2023 | Technically Complete Application |
Magellan Terminals Holdings, L.P. | Galena Park Terminal | 1128 | 10/16/2023 | Technically Complete Application |
Mansfield Plumbing Products LLC | Mansfield Plumbing Henderson Plant | 2626 | 01/20/2025 | Administrative Complete Application |
Mark One Ii, LLC | Mark One Ii | 4692 | 10/03/2024 | Administrative Complete Application |
Martech, LLC | Martech | 2552 | 07/12/2024 | Technically Complete Application |
Martin Marietta North Texas Cement, LLC | Midlothian Facility | 1077 | 12/05/2023 | Technically Complete Application |
Mauser USA, LLC | Mauser Usa | 3319 | 08/20/2024 | Technically Complete Application |
Midcoast G & P (East Texas) L.P. | Henderson Gas Plant | 3788 | 04/23/2025 | Administrative Complete Application |
Midcoast G & P (East Texas) L.P. | Horseshoe Treater | 4135 | 08/01/2024 | Technically Complete Application |
Midcoast G & P (East Texas) L.P. | Longview Gas Processing Plant | 3251 | 07/01/2024 | Technically Complete Application |
Motiva Enterprises LLC | Port Arthur Refinery | 1386 | 01/28/2025 | Administrative Complete Application |
Motiva Enterprises LLC | Port Terminal | 3277 | 12/19/2024 | Administrative Complete Application |
MVP Terminalling, LLC | Pasadena Terminal | 4089 | 01/29/2025 | Administrative Complete Application |
N | Back to top | |||
Natural Gas Pipeline Company of America LLC | Compressor Station 304 Marshall | 3200 | 03/31/2025 | Administrative Complete Application |
NGL Water Solutions Permian, LLC | Lex Ii Generator | 4663 | 07/18/2024 | Technically Complete Application |
Northern Natural Gas Company | Spraberry Compressor Station | 3260 | 08/09/2024 | Administrative Complete Application |
Nouryon Surface Chemistry LLC | Nouryon Surface Chemistry Houston Plant | 1328 | 12/04/2024 | Technically Complete Application |
Nrg Thw Gt LLC | T H Wharton Electric Generating Station | 4712 | 12/19/2024 | Administrative Complete Application |
Nucor Corporation | Nucor Steel Jewett Texas Division | 1289 | 12/06/2024 | Administrative Complete Application |
NuStar Logistics, L.P. | Corpus Christi Terminal | 1238 | 03/13/2024 | Technically Complete Application |
NUTRIEN US LLC | Nutrien Us Borger Nitrogen Operations | 1689 | 03/26/2025 | Administrative Complete Application |
O | Back to top | |||
Occidental Permian, Ltd. | Denver Unit Co2 Recovery Plant | 3051 | 02/05/2025 | Administrative Complete Application |
Occidental Permian, Ltd. | Wasson Co2 Removal Plant | 553 | 12/20/2024 | Administrative Complete Application |
Occidental Permian, Ltd. | Anton Co2 Reinjection Facility | 4733 | 03/19/2025 | Administrative Complete Application |
ONEOK WesTex Transmission L.L.C. | Red River Compressor Station 1 Wheeler | 564 | 03/27/2025 | Administrative Complete Application |
OQ Chemicals Bishop, LLC | Bishop Plant | 2009 | 10/01/2024 | Technically Complete Application |
Owens Corning Roofing and Asphalt, LLC | Houston Roofing Plant | 1543 | 01/06/2025 | Administrative Complete Application |
Oxbow Calcining LLC | Port Arthur Plant | 1493 | 02/07/2025 | Administrative Complete Application |
OXY USA Inc. | Block 31 Gas Plant | 547 | 07/30/2024 | Technically Complete Application |
Oxy USA WTP LP | Willard Co2 Separation Plant | 549 | 03/07/2025 | Administrative Complete Application |
Oxy USA WTP LP | Salt Creek Gas Plant | 550 | 02/18/2025 | Administrative Complete Application |
Oxy Vinyls, LP | La Porte Vcm Plant | 1324 | 01/29/2024 | Technically Complete Application |
P | Back to top | |||
Pactiv LLC | Corsicana Plant | 1067 | 11/22/2024 | Administrative Complete Application |
Pactiv LLC | Temple Plant | 1312 | 02/17/2025 | Administrative Complete Application |
Pasadena Refining System, Inc | Pasadena Refinery System | 3711 | 04/16/2021 | Technically Complete Application |
PCI Nitrogen, LLC | Pasadena Facility | 1252 | 03/29/2023 | Technically Complete Application |
Pelican Island Storage Terminal, LLC | Pelican Island Storage Terminal | 851 | 12/09/2024 | Administrative Complete Application |
Petra Nova Parish Holdings LLC | Carbon Capture Plant | 3611 | 08/30/2024 | Technically Complete Application |
Phillips 66 Company | Johnson Tank Farm | 4130 | 04/25/2024 | Technically Complete Application |
PHR Holdings LLC | Ph Robinson Electric Generating Station | 3756 | 11/25/2024 | Administrative Complete Application |
Plains Pipeline, L.P. | Gardendale Jv/N Terminal | 3772 | 04/10/2025 | Administrative Complete Application |
Plains Pipeline, L.P. | Wink Complex | 4152 | 10/01/2024 | Administrative Complete Application |
Plains Pipeline, L.P. | Gardendale South Pgs Gardendale Terminal | 3624 | 11/13/2024 | Administrative Complete Application |
Plains Pipeline, L.P. | Colorado City Tank Farm | 4151 | 08/26/2024 | Administrative Complete Application |
Prysmian Cables and Systems USA, LLC | Prysmian Cables And Systems | 2426 | 08/30/2024 | Administrative Complete Application |
R | Back to top | |||
R. R. DONNELLEY & SONS COMPANY | Rr Donnelley Wetmore | 3348 | 12/18/2024 | Administrative Complete Application |
R2R and D, LLC | Fiberglass Pultrusion Facility | 3626 | 05/20/2024 | Technically Complete Application |
Red Ewald LLC | Red Ewald | 4675 | 08/14/2024 | Technically Complete Application |
Remy Jade Generating LLC | Remy Jade Power Station | 4647 | 05/15/2024 | Technically Complete Application |
Remy Jade II LLC | Remy Jade Ii | 4668 | 08/08/2024 | Technically Complete Application |
Roehm America LLC | Roehm America Bay City Site | 4671 | 08/09/2024 | Administrative Complete Application |
Rohm and Haas Texas Incorporated | P-North | 2234 | 02/04/2025 | Administrative Complete Application |
Rohm and Haas Texas Incorporated | B-3/Hr Process Area | 1583 | 02/03/2025 | Administrative Complete Application |
Rohm and Haas Texas Incorporated | Utilities Area | 2232 | 07/11/2024 | Administrative Complete Application |
Royal Baths Manufacturing Company | Chrisman Road Facility | 1824 | 12/04/2024 | Technically Complete Application |
Royal Baths Manufacturing Company | Burns Street Facility | 2058 | 12/04/2024 | Technically Complete Application |
RPC Merchant LLC | Cedarvale Facility | 4724 | 02/05/2025 | Administrative Complete Application |
RPC Merchant LLC | Faulkner Facility | 4703 | 11/01/2024 | Administrative Complete Application |
RPC Merchant LLC | Silver Facility | 4698 | 10/18/2024 | Administrative Complete Application |
RPC Merchant LLC | Pyote Facility | 4723 | 02/05/2025 | Administrative Complete Application |
RPC Merchant LLC | Cheyanne Facility | 4702 | 10/18/2024 | Administrative Complete Application |
Rpc Power LLC | Plains Texas Ii Facility | 4460 | 04/10/2025 | Administrative Complete Application |
Rpc Power LLC | Plains Texas Facility | 4457 | 04/08/2025 | Administrative Complete Application |
S | Back to top | |||
Samsung Austin Semiconductor, L.L.C. | Samsung Austin Semiconductor 1 | 4088 | 12/18/2024 | Technically Complete Application |
Sasol Chemicals (USA) LLC | Greens Bayou Plant | 1254 | 01/31/2025 | Administrative Complete Application |
Scout Energy Management LLC | Lynx Main & B | 3161 | 09/13/2024 | Administrative Complete Application |
Sekisui Specialty Chemicals America, LLC | Pasadena Plant | 2308 | 06/11/2024 | Technically Complete Application |
Shumard Corporation | Fiberglass Manufacturing Facility | 4727 | 02/11/2025 | Administrative Complete Application |
SI Group, Inc. | Freeport Facility | 1431 | 10/17/2023 | Technically Complete Application |
Signal Hill Generating LLC | Wichita Falls Cogeneration Plant | 92 | 05/08/2024 | Technically Complete Application |
Sjrr Power LLC | Sjrr Power Peaking Facility | 4153 | 08/02/2024 | Technically Complete Application |
Skeeter Products, Inc. | Skeeter Products | 4737 | 03/31/2025 | Administrative Complete Application |
Sky Global Power One, LLC | Sgp1 | 3799 | 02/07/2025 | Administrative Complete Application |
Smith Industries, LLC | Smith Industries | 4188 | 10/17/2024 | Technically Complete Application |
Solar Turbines Incorporated | Dallas Overhaul Center | 1333 | 07/03/2024 | Administrative Complete Application |
Solar Turbines Incorporated | Dallas Overhaul Center | 1333 | 03/07/2024 | Technically Complete Application |
Solutia Inc. | Dpo | 2317 | 08/14/2024 | Technically Complete Application |
South Texas Electric Cooperative, Inc. | South Texas Electric Cooperative | 799 | 05/09/2025 | Administrative Complete Application |
Southwestern Public Service Company | Harrington Station Power Plant | 15 | 12/06/2024 | Administrative Complete Application |
Southwestern Public Service Company | Jones Station Power Plant | 14 | 05/02/2024 | Technically Complete Application |
Southwestern Public Service Company | Nichols Station Power Plant | 13 | 01/07/2025 | Administrative Complete Application |
Southwestern Public Service Company | Harrington Station Power Plant | 15 | 05/16/2016 | Technically Complete Application |
StarTex Field Services, LLC | Pawnee Treating Plant | 3136 | 10/22/2024 | Administrative Complete Application |
Steel Dynamics Southwest, LLC | Sinton Mill | 4324 | 10/30/2024 | Administrative Complete Application |
SWG Pipeline, L.L.C. | Ponder Compressor Station | 4537 | 12/18/2024 | Administrative Complete Application |
Synthomer Adhesive Technologies LLC | C8 - Eastoflex | 1978 | 01/27/2025 | Technically Complete Application |
T | Back to top | |||
Targa Downstream LLC | Mont Belvieu Terminal | 615 | 12/12/2024 | Administrative Complete Application |
Targa Gas Processing LLC | High Plains Gas Plant | 4502 | 09/29/2023 | Technically Complete Application |
Targa Midstream Services LLC | Sterling Gas Processing Plant | 133 | 04/03/2025 | Administrative Complete Application |
Targa Pipeline Mid-Continent WestTex LLC | Benedum Gas Plant | 3111 | 03/22/2025 | Administrative Complete Application |
Targa Pipeline Mid-Continent WestTex LLC | Gateway Gas Plant | 4639 | 04/11/2024 | Technically Complete Application |
Techemet, LP | Techemet Genoa Red Bluff Road Facility | 4197 | 01/15/2025 | Administrative Complete Application |
Teijin Automotive Technologies Texas LLC | Teijin Automotive Technologies Texas | 4196 | 08/01/2024 | Technically Complete Application |
Tejas Power Generation, LLC | Tejas Power Generation Unit 1 | 3999 | 04/03/2025 | Administrative Complete Application |
Tennessee Gas Pipeline Company, L.L.C. | Compressor Station 17 | 3081 | 07/30/2024 | Technically Complete Application |
Tennessee Gas Pipeline Company, L.L.C. | Tgp Compressor Station 1 Agua Dulce | 3039 | 07/23/2024 | Technically Complete Application |
Tennessee Gas Pipeline Company, L.L.C. | Compressor Station 9 | 3062 | 07/01/2024 | Technically Complete Application |
Terra-Vaults, Inc. | Gainesville Facility | 4715 | 01/07/2025 | Administrative Complete Application |
Texas Eastern Transmission, LP | Mont Belvieu Compressor Station | 3065 | 05/10/2024 | Technically Complete Application |
Texas Eastern Transmission, LP | Vidor Compressor Station | 3100 | 03/25/2025 | Administrative Complete Application |
Texas Instruments Incorporated | Texas Instruments North Campus | 1311 | 04/02/2025 | Administrative Complete Application |
Thad Hill Energy Center, LLC | Bosque County Power Plant | 1886 | 10/14/2024 | Technically Complete Application |
The Chemours Company FC, LLC | Ingleside Plant | 4182 | 12/17/2024 | Administrative Complete Application |
The Dow Chemical Company | Freeport Energy Center | 2697 | 07/31/2024 | Technically Complete Application |
The Dow Chemical Company | Versene Land Tran And Site Mtc | 2220 | 09/13/2024 | Administrative Complete Application |
The Dow Chemical Company | Specialty Chemicals 2 | 2221 | 09/19/2024 | Technically Complete Application |
The Dow Chemical Company | Polyethylene | 3905 | 11/02/2023 | Technically Complete Application |
The Dow Chemical Company | Specialty Chemicals 2 | 2221 | 04/17/2025 | Administrative Complete Application |
The Dow Chemical Company | Cogeneration Facilities | 1882 | 04/15/2024 | Technically Complete Application |
The Dow Chemical Company | Monomeric Methylene Diphenyl Diilsocyanate Mmdi Plant | 4393 | 02/28/2025 | Administrative Complete Application |
The Dow Chemical Company | Chemicals & Metals (3) | 2203 | 09/23/2024 | Administrative Complete Application |
The Dow Chemical Company | Site Functions 3 | 2219 | 04/23/2025 | Administrative Complete Application |
The Dow Chemical Company | Polyethylene 7 Plant | 4689 | 09/27/2024 | Administrative Complete Application |
The Dow Chemical Company | Hydrocarbons | 2213 | 09/30/2024 | Administrative Complete Application |
The Goodyear Tire & Rubber Company | Houston Chemical Plant | 1227 | 01/23/2024 | Technically Complete Application |
The Lubrizol Corporation | Lubrizol Corporation Bayport Texas Plant | 1582 | 02/07/2025 | Administrative Complete Application |
The Lubrizol Corporation | Chemithon And 156 Units | 1932 | 05/13/2024 | Technically Complete Application |
The Lubrizol Corporation | The Lubrizol Corporation/Bl-4 System | 2191 | 12/09/2024 | Administrative Complete Application |
The Lubrizol Corporation | Blending, Storage And Loading | 1581 | 12/09/2024 | Administrative Complete Application |
The Lubrizol Corporation | Main Manufacturing Building, 0710 And Spp Units | 1934 | 02/12/2024 | Technically Complete Application |
The Lubrizol Corporation | Polyisobutylene Plant | 1935 | 03/09/2023 | Technically Complete Application |
Ticona Polymers, Inc. | Wastewater Treatment Plant (Wwtp) | 3269 | 05/01/2024 | Technically Complete Application |
Topsoe, Inc. | Topsoe Bayport | 1217 | 05/02/2025 | Administrative Complete Application |
Topsoe, Inc. | Topsoe Bayport | 1217 | 09/16/2024 | Technically Complete Application |
Topsoe, Inc. | Topsoe Bayport | 1217 | 03/12/2025 | Administrative Complete Application |
Topsoe, Inc. | Topsoe Bayport | 1217 | 07/16/2024 | Technically Complete Application |
TotalEnergies Petrochemicals & Refining USA, Inc. | La Porte Polypropylene Plant | 1293 | 01/29/2025 | Administrative Complete Application |
TotalEnergies Petrochemicals & Refining USA, Inc. | Port Arthur Refinery | 1267 | 02/03/2015 | Technically Complete Application |
TPC Group LLC | Houston Plant | 1598 | 01/15/2025 | Administrative Complete Application |
Transcontinental Gas Pipe Line Company, LLC | Transco Compressor Station 30 | 4101 | 11/15/2023 | Technically Complete Application |
Trinity River Authority Of Texas | Central Regional Wastewater System | 4654 | 06/25/2024 | Technically Complete Application |
Trunkline Gas Company, LLC | Cypress Compressor Station | 3191 | 03/11/2025 | Administrative Complete Application |
TX LFG Energy, LP | Humble Renewable Energy Plant | 2565 | 07/26/2024 | Technically Complete Application |
U | Back to top | |||
Union Carbide Corporation | Vinyl Acetate Unit | 1924 | 12/06/2024 | Administrative Complete Application |
Union Carbide Corporation | High Pressure Ii Unit | 2026 | 04/11/2025 | Administrative Complete Application |
Union Carbide Corporation | High Pressure Ii Unit | 2026 | 10/14/2024 | Administrative Complete Application |
Union Carbide Corporation | Low Pressure Polyethylene & Catalyst Facilities | 2032 | 08/09/2024 | Administrative Complete Application |
Union Carbide Corporation | Low Pressure Oxo & Synthesis Gas Supply Unit | 1919 | 04/22/2024 | Technically Complete Application |
United Services Automobile Association | San Antonio Facility | 2846 | 01/23/2025 | Administrative Complete Application |
United States Gypsum Company | Galena Park Plant | 3129 | 10/10/2024 | Administrative Complete Application |
US Department of the Army | Us Army Fort Bliss | 2865 | 12/22/2021 | Technically Complete Application |
V | Back to top | |||
Valero Partners PAPS, LLC | El Vista Terminal | 2739 | 11/18/2024 | Administrative Complete Application |
Valero Refining-Texas, L.P. | Valero Corpus Christi Refinery West Plant | 1458 | 07/30/2023 | Technically Complete Application |
Valero Terminaling and Distribution Company | Valero Taylor Terminal | 4127 | 05/02/2024 | Technically Complete Application |
Viron International Corporation | Fiberglass Spray Facility | 2745 | 09/19/2024 | Technically Complete Application |
Vopak Industrial Infrastructure Americas Freeport, LLC | Vopak Terminal Freeport | 2217 | 06/06/2024 | Technically Complete Application |
W | Back to top | |||
Watco Tanks, Inc. | Fm 539 Plant | 2985 | 11/28/2023 | Technically Complete Application |
Westlake Epoxy Inc. | Westlake Deer Park - Resins | 1940 | 07/10/2024 | Technically Complete Application |
Westlake Epoxy Inc. | Westlake Deer Park - Bpa | 4648 | 05/22/2024 | Technically Complete Application |
Westlake Longview Corporation | P3 - Polyethylene 3 | 1967 | 02/05/2024 | Technically Complete Application |
WestRock Texas, LP | Evadale Mill | 1265 | 12/30/2024 | Technically Complete Application |
Wharton County Generation, LLC | Wharton County Generation Facility | 86 | 12/04/2024 | Technically Complete Application |
Wilsonart LLC | Temple North Laminate Manufacturing Plant | 1022 | 09/06/2024 | Technically Complete Application |
Wolf Hollow I Power, LLC | Wolf Hollow I | 2066 | 02/06/2024 | Technically Complete Application |
WTG Jameson, LP | Jameson Gas Plant | 865 | 02/27/2025 | Administrative Complete Application |
Wyman-Gordon Forgings, Inc. | Wyman Gordon Forgings - Cypress Facility | 4688 | 09/27/2024 | Technically Complete Application |